Laserfiche WebLink
. I <br /> I <br /> Sheet E6.02I—Electrical Schedules: <br /> I <br /> 1. Add panel schedules for panels ECB and EQB and revise schedule NER as shown on attached <br /> sketches�ESK-6, ESK-7, and ESK-8, dated September 15, 1999. <br /> � <br /> Sheet M0.01 —Schedules: <br /> � <br /> 1. Revise the VAV Box Schedule as shown on attached sketch MSK-1, dated September 15, 1999. <br /> 2. Revise riote 3 on the Fan Schedule as shown on attached sketch MSK-1, dated September 15, 1999. <br /> 3. Revise riote 8 on the Air Handling Unit Schedule as shown on attached sketch MSK-2, dated <br /> Septemb�er 15, 1999. <br /> Sheet M1.OlYl —First Floor Plan—HVAC: <br /> 1. Revise the ductwork as shown on attached sketch MSK-3, dated September 15, 1999. <br /> Sheet M1.02—First Floor Plan—HVAC Piping: <br /> 1. Revise he thermostat location to terminal unit V20-5 as shown on attached sketch M <br /> , SK-4, dated <br /> September 15, 1999. <br /> 2. Revise the hot water flow to terminal unit V20-5 as shown on attached sketch MSK-4, dated <br /> September 15, 1999. <br /> Sheet P2.01 —First Floor Plan—Plumbing: <br /> 1. Add the following note to fixture P-3 in Exam/Cast Room 1-101: <br /> "13. Contractor shall provide P-3 fixture with J.R. Smith 8730 interceptor." <br /> 2. <br /> Sheet FP-1 i First Floor Plan—Fire Protection: <br /> 1. Revise e sprinkler layout as shown on attached sketch FPSK-1, dated September 15, 1999. <br /> I <br /> CHANGES TO THE SPECIFICATIONS <br /> 1. Add a�ached Section 15375 — Stand i e and Hose S stem. <br /> pP Y <br /> 2. Add at�ached Section 15510—Automatic Sprinkler System—Wet Pipe. <br /> 3. Add att�ched Hydraulic Calculations. <br /> '� <br /> n Addendum�To. 1 Page-2 Phoenix Design Group, Inc. <br /> 104 Woodmont Blvd•Suite 218•Nashville,TN 37205•(615)386-9287 <br /> � <br /> �� <br />