Laserfiche WebLink
0 the �edge group, p.a. OIVNER I7 <br /> � ARCHITECT L7 <br /> � 444 BUNK�R ROAD, WEST PALM BEACH CONTRACTOR ❑ <br /> � FLORID, 3 405-3894 t67/685-9307 <br /> I � ,�, 4o-t FIELD ❑ <br /> , � Medical Of�ice Building <br /> CHANGE ORDER No. 1 Date: �pJ17/� ARCHITECTS PROJECT No. g412_ • <br /> Owner: I T0: � <br /> l ''� I � � <br /> East Pasc;o Medical Center Poole Construction Co. , Inc. <br /> 7050 Ga11 ;Blvd. 544 Douglas Avenue <br /> Zephyrhills, FL 33541 � � Altamonte Springs, FL 32714 � <br /> � <br /> You ar;e directed'to make the following changes in the above project: <br /> I " <br /> The coist quoted i�ncludes all labor and material, (re: paragraph 4 of General Conditions) necessary to <br /> complete the work, as indicated herein and in the construction documents where they apply. Conflicts <br /> will b,e governed�by this Change Order,for this part of the work only. <br /> � <br /> � � � <br /> � � Star 4 Revisions: <br /> '. 1. Add 2 smoke walls as indicated on Drawing A-2, across the <br /> , � building. � <br /> � <br /> ' 2. Add the following 20 minute doors in the corridors at the smoke <br /> , � walls, 07, 29, 51 and 57,, as indicated on Supplementary <br /> � iiI Drawings SD-5A and SD-5B, dated oct. 17, 1995. <br /> ' li <br /> ' I � 3. Add Sliding Window Type "D" in Physician�s offices 14, 21, 43 <br /> ' �, � and 50, as indicated on Drawings A-2 and A-6, revised Star 4, <br /> �, � dated Oct. 16, 1995, Emergency Egress. <br /> '� 4. The ceiling membrane is to be continuous over partitions as <br /> � � indicated on Drawings A-7, A-8 and A-9, and on Detail 1/A-7, <br /> , revision Star 4, dated Oct. 16, 1995. <br /> li <br /> l�ttachments: (�is�an,d,ed documrnn cMc wppon dexrfpUon) <br /> Drawings A-2, ',IA-3, A-5, A-6, A-7, A-8, A-9, A-10 and A-11, rev. Star 4, Oct. 16, 1995 <br /> i <br /> Supplementary Drawings SD-5A and SD-5B, dated Oct. 17, 1995. <br /> � <br /> � , BY: <br /> � <br /> The o�riginal Pr�oj ect Cost was . . . . . . . . . . . . . . . . . . . . . $ <br /> Net c!hange by previous Change Orders . . . . . . . . . . . . . . . . . $ <br /> The Cost priorlito this Change Order was . . . . . . . . . . . . . . . . $ <br /> The Cost will �b;e (increased) (decreased) (unchanged) . � <br /> by this Chan�ge Order . . • • • • • • • • • • • • • • • • � <br /> The new Cost i�n;cluding this Change Order will be . . . . . . . . . . . <br /> � <br /> I ' <br /> i � <br /> � <br /> ' I --- <br /> {�, i <br /> The �Edge Group, P.A. East Pasc Medical Center Poole Construction Co. , Inc. <br /> 444 Bunker Road 7050 Ga Boulevard 544 Douglas Avenue <br /> West P la. 33405 Zephy ' ll , � Altamonte Springs, FL 32714 <br /> BY � BY , BY <br /> —� , �����3�� � ���f �9e �� _ 4���'� � ' �g. � ►��`}'r <br />