0 the �edge group, p.a. OIVNER I7
<br /> � ARCHITECT L7
<br /> � 444 BUNK�R ROAD, WEST PALM BEACH CONTRACTOR ❑
<br /> � FLORID, 3 405-3894 t67/685-9307
<br /> I � ,�, 4o-t FIELD ❑
<br /> , � Medical Of�ice Building
<br /> CHANGE ORDER No. 1 Date: �pJ17/� ARCHITECTS PROJECT No. g412_ •
<br /> Owner: I T0: �
<br /> l ''� I � �
<br /> East Pasc;o Medical Center Poole Construction Co. , Inc.
<br /> 7050 Ga11 ;Blvd. 544 Douglas Avenue
<br /> Zephyrhills, FL 33541 � � Altamonte Springs, FL 32714 �
<br /> �
<br /> You ar;e directed'to make the following changes in the above project:
<br /> I "
<br /> The coist quoted i�ncludes all labor and material, (re: paragraph 4 of General Conditions) necessary to
<br /> complete the work, as indicated herein and in the construction documents where they apply. Conflicts
<br /> will b,e governed�by this Change Order,for this part of the work only.
<br /> �
<br /> � � �
<br /> � � Star 4 Revisions:
<br /> '. 1. Add 2 smoke walls as indicated on Drawing A-2, across the
<br /> , � building. �
<br /> �
<br /> ' 2. Add the following 20 minute doors in the corridors at the smoke
<br /> , � walls, 07, 29, 51 and 57,, as indicated on Supplementary
<br /> � iiI Drawings SD-5A and SD-5B, dated oct. 17, 1995.
<br /> ' li
<br /> ' I � 3. Add Sliding Window Type "D" in Physician�s offices 14, 21, 43
<br /> ' �, � and 50, as indicated on Drawings A-2 and A-6, revised Star 4,
<br /> �, � dated Oct. 16, 1995, Emergency Egress.
<br /> '� 4. The ceiling membrane is to be continuous over partitions as
<br /> � � indicated on Drawings A-7, A-8 and A-9, and on Detail 1/A-7,
<br /> , revision Star 4, dated Oct. 16, 1995.
<br /> li
<br /> l�ttachments: (�is�an,d,ed documrnn cMc wppon dexrfpUon)
<br /> Drawings A-2, ',IA-3, A-5, A-6, A-7, A-8, A-9, A-10 and A-11, rev. Star 4, Oct. 16, 1995
<br /> i
<br /> Supplementary Drawings SD-5A and SD-5B, dated Oct. 17, 1995.
<br /> �
<br /> � , BY:
<br /> �
<br /> The o�riginal Pr�oj ect Cost was . . . . . . . . . . . . . . . . . . . . . $
<br /> Net c!hange by previous Change Orders . . . . . . . . . . . . . . . . . $
<br /> The Cost priorlito this Change Order was . . . . . . . . . . . . . . . . $
<br /> The Cost will �b;e (increased) (decreased) (unchanged) . �
<br /> by this Chan�ge Order . . • • • • • • • • • • • • • • • • �
<br /> The new Cost i�n;cluding this Change Order will be . . . . . . . . . . .
<br /> �
<br /> I '
<br /> i �
<br /> �
<br /> ' I ---
<br /> {�, i
<br /> The �Edge Group, P.A. East Pasc Medical Center Poole Construction Co. , Inc.
<br /> 444 Bunker Road 7050 Ga Boulevard 544 Douglas Avenue
<br /> West P la. 33405 Zephy ' ll , � Altamonte Springs, FL 32714
<br /> BY � BY , BY
<br /> —� , �����3�� � ���f �9e �� _ 4���'� � ' �g. � ►��`}'r
<br />
|