My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6606 STADIUM DR (2)
Zephyrhills
>
Building Department
>
Building Plans
>
6606 STADIUM DR (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 11:05:05 AM
Creation date
5/2/2017 10:57:54 AM
Metadata
Fields
Template:
Building Plans
Street #
6606 STADIUM DR
Location
STADIUM DR
Contractor
RONALD E HUFF
Building Plans - Permit #
DIALYSIS CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> i � <br /> iI BASIC MECHANICAL REQUIREMENTS <br /> � , SECTION 15010 <br /> I , <br /> � ; <br /> I. PART 1 !GENERAL <br /> I <br /> i <br /> 1.1 RELATED DOCUMENTS: Division 1 - General Requirements apply to the work specified in <br /> 4his section. <br /> 1.2 MECHANICAL CONTRACTOR QUALIFICATIONS <br /> I ; <br /> A. The Owner intends to award this contract to a Bidder whose subcontractors are <br /> ' competent to perform and complete the work in a satisfactory and timely manner. All <br /> Bidders and subcontractors must be qualified at the time of bid opening. <br /> i <br /> IB. Mechanical Contractor must have a current Florida Class "A" Mechanical Contractor's <br /> � license and been in business for a minimum of 2 years. <br /> 1.3 �DESCRIPTION OF WORK <br /> i <br /> �A. The work to be performed under this division includes, but is not necessarily limited to, <br /> � ' the following: � <br /> � 1. Pumps. <br /> ! 2. Hydronic piping and accessories. <br /> , ' 3. Packaged cooling units. <br /> I ' 4. Ventilating and exhaust fans. <br /> i 5. Insulation. <br /> � 6. Ductwork- Metal. <br /> � ; 7. Grilles, registers and diffusers. <br /> ! i 8. Temperature controls. <br /> � 9. Starters and motor controllers. <br /> 10. All shop and field prime painting. <br /> ; � 11. Furnishing access doors. <br /> i � 12. Plumbing piping fixtures and equipment. <br /> 13. Rigging. <br /> I 14. Pertormance tests, adjustments and balancing of all systems. (Provided by Div. 15 <br /> � Contractor.) <br /> �B. Work not included in this Division: The following work is specified in other sections of <br /> ' the specifications: <br /> 1. Finish painting except as specifically included herein. <br /> 2. Electric work except as specifically included herein. <br /> � 3. Masonry and concrete foundations for equipment. <br /> � 4. Access doors. <br /> 5. Flashings, but counter flashings shall be included herein. <br /> 6. Cutting and patching except as included herein. . <br /> ' 7. Intake and discharge wall louvers and screens. <br /> I ; 8. Furnishing and setting food service equipment. <br /> ' � 9. Furnishing and setting sterilizer equipment. <br /> ; 10. Furnishing and setting laboratory equipment. <br /> ' 11. Test and balance except as specifically included herein. <br /> � <br /> � <br /> � <br /> i <br /> � ; <br /> (97008-040497) 15010-1 <br /> I <br /> � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.