My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38113 MARKET SQ
Zephyrhills
>
Building Department
>
Building Plans
>
38113 MARKET SQ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2017 8:01:03 AM
Creation date
5/13/2017 7:28:02 AM
Metadata
Fields
Template:
Building Plans
Street #
38113 MARKET SQ
Location
MARKET SQ
Contractor
HINSON BUILDING CORP
Description
INTERIOR BUILD OUT FOR MRI UNIT
Owner
FLORIDA MEDICAL UNIT
Building Plans - Permit #
8889B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � <br /> • ; SECTION 15010 - GENERAL PROVISIONS <br /> i PART 1 - GENERAL � <br /> � � <br /> 1.1 RELATED DOCUMENTS: <br /> � � <br /> � A. The Work of this Section affects and is affected by the Work of <br /> ' � other Divisions and other Division 15 Sections. Review each <br /> , � portion of the Contract Documents including General and <br /> ' Supplementary Conditions, Addenda, Drawings and Division 1 <br /> ! through Division 16 Specification Sections to determine the extent <br /> � I of the Work of this Section. <br /> � • � <br /> i 1.2 DESCRIPTION OF PROJECT <br /> � <br /> � A. Principal features of work included are: <br /> I <br /> ' Heating, ventilating, and air-conditioning system: New roof <br /> I mounted equipment, and split system computer room air <br /> � conditioning for a new MRI installation in an existing building and <br /> I � relocation of existing diffusers and duct work in the existing office <br /> � � space. Installing a shield cooler water chiller. Demolition of an <br /> • � � existing AHU and accessories is required. <br /> � <br /> i Plumbing system: adding two restrooms, a water heater and break <br /> � room sink. <br /> I � Fire protection system: Extending an existing wet pipe sprinkler <br /> � I system to accommodate changes in space layout. Hydraulic <br /> � calculations and system layout by the installer are required. <br /> I <br /> � Control system for new HVAC equipment, including line and low <br /> ' voltage control wiring and conduit. <br /> i <br /> ' 1.3 WORK INCLUDED <br /> A. Provide labor, materials, tools, and services for a complete <br /> iinstallation of equipment and systems described in contract <br /> documents. <br /> B. Contractor shall assume responsibility for liability, workmanship <br /> and quality of materials concerning work sublet to others. <br /> � 1.4 RELATED WORK <br /> � <br /> � � <br /> � ICT 99184 <br /> I, 15010 - 1 <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.