My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38113 MARKET SQ
Zephyrhills
>
Building Department
>
Building Plans
>
38113 MARKET SQ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2017 8:01:03 AM
Creation date
5/13/2017 7:28:02 AM
Metadata
Fields
Template:
Building Plans
Street #
38113 MARKET SQ
Location
MARKET SQ
Contractor
HINSON BUILDING CORP
Description
INTERIOR BUILD OUT FOR MRI UNIT
Owner
FLORIDA MEDICAL UNIT
Building Plans - Permit #
8889B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� '� <br /> � � <br /> � <br /> A. Electrical power and interlock wiring and conduit. ; • <br /> �I <br /> B. Cutting and patching of holes required for installation ;of air <br /> handlers pipes and ducts; however, Contractor shall furnisli shop <br /> drawings showing locations and sizes of required holes, pi•ior to <br /> construction. � <br /> C. Flashing of ducts and pipes into roofs and outside walls. <br /> 1.5 JOB CONDITIONS: <br /> A. Submittal of bid implies that the bidder has visited the job site and <br /> is familiar with conditions there and has read applicable parab aphs <br /> of the specifications and will be bound by their conditions. <br /> I <br /> 1.6 LOCAL CONDITIONS: I <br /> I <br /> A. Conform with local conditions. Coordinate with local utiliti��es on <br /> size of utility services. � <br /> i <br /> B. As-built drawings are not available from the building ownerl, As- <br /> built conditions indicated are based on limited site observations by <br /> the Desib er. � • <br /> � <br /> 1.7 INTENT i <br /> I <br /> A. The contract documents (drawings, plans and specifications) <br /> describe the mechanical work of this project. Any item mentioned <br /> in one part sha11 be as binding as thou�h mentioned in both. <br /> � <br /> B. The contract documents form a guide for a complete mech���nical <br /> installation. Where an item is reasonably necessary bu�: not <br /> specifically mentioned, such as duct hangers or transitions, piping <br /> offsets, drains, etc., for a complete system, provide same wi��thout <br /> additional cost to Owner. <br />� C. Mechanical layouts indicated on drawings are dia�ammatical ionly. <br /> Exact locations of ducts, pipes, and equipment shall be governed <br /> by the drawings of related trades. Desib er reserves right to rriake <br /> reasonable changes in location of inechanical equipment� and <br /> appurtenances. , <br />� � <br /> D. The contract documents represent work to be done in view of total <br /> project requirements. Final location of ducts, pipes, or equipment, <br /> � � <br /> � <br /> I <br /> ICT 99184 � <br /> �� <br /> 15010 - 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.