Laserfiche WebLink
i <br /> � <br /> i <br /> to eliminate possible conflict with other trades is the responsibility <br /> • � of Contractor. <br /> 1.8 DEVIATIONS � <br /> A. No deviations from specifications and drawings shall be made <br /> ; without full knowledge and written consent of Designer. <br /> ' B. Should Contractor find during progress of work that, in <br /> � Contractor's judgment, existing conditions make desirable a <br /> ; modification of the requirements of any particular item, the <br /> � Contractor shall report such item promptly to Designer for <br /> � instructions. <br /> � <br /> � <br /> 1.9 WORKMANSHIP: <br /> ; <br /> � A. All work shall be performed by competent mechanics specifically <br /> qualified in the appropriate disciplines. <br /> 1.10 OBSERVATIONS <br /> , <br /> A. Designer will provide periodic observation of the progress of work. <br /> • � <br /> � B. Designer's time for general observation or test observance as <br /> described herein will be borne by Designer except in cases where <br /> Designer has been requested to visit the job and finds Contractor <br /> � has caused Designer an unnecessary visit. It shall be deemed an <br /> i unnecessary visit in the following circumstances: <br /> � I <br /> '; 1. Due to lack of supervision. <br /> � <br /> ' 2. Test is not ready for observation. I� <br /> � <br /> ' 3. Designer is placed in role of determining reason system or <br /> � equipment is not operating properly, only to find Contractor <br /> has not fulfilled his responsibility in troubleshooting. <br /> 4. Contractor requests a trip to check off final punch list items <br /> and no attempt has been made by Contractor to correct <br /> previous punch list items. <br /> C. Contractor will have deducted from the retained amount, $400.00 <br /> per person per day plus mileage and living expenses for each <br /> • , unnecessary visits. <br /> � <br />� ICT 99184 <br /> ; 15010 - 3 <br /> i <br /> I <br />