Laserfiche WebLink
I <br /> I • <br /> � <br /> � <br /> � I <br /> SECTI'ON 15300 -FIRE PROTECTION <br /> i <br /> i <br /> PART 1 - GENERAT, <br /> � <br /> � 1.1 WORK INCLUDED <br /> � A. Materials, accessories, equipment, tools, and transportation and <br /> � performance of all services and labor required to install completely <br /> ' the sprinkler and fire protection work for this project as specified. <br /> i <br /> B. SCOPE OF WORK <br /> � <br /> 1. Design, Hydraulic Calculations and Shop drawings. <br /> � 2. Pipe, fittings, and valves. <br /> I 3. Hangers, supports and sleeves. <br /> i <br /> , 4. Testing and flushing. <br /> I <br /> � 5. Cutting holes necessary for the installation of work <br /> • specified under this Section. <br /> I <br /> � 1.2 INSTALLATION REQUIREMENTS <br /> i <br /> � A. Design and install system(s) in accordance with the drawings, <br /> specifications, and requirements of NFPA 13,NFPA 14,NFPA 20, <br /> � and NFPA 24. <br /> I B. Furnish material and labor necessary to fully comply with the <br />� � <br /> ii design drawings and specifications and with applicable rules, <br /> � regulations, and ordinances. <br /> ii C. Coordinate cutting of material with other Divisions. Employ <br /> services of other trades for patching of concrete,masonry, and <br /> �. other material. Use same material for patching and finish neatly. <br /> � <br /> ;1.3 QUALITY ASSURANCE <br /> A. Materials bearing UL and FM approval, where such approval is <br /> applicable or required by the agencies having jurisdiction over fire <br /> protection work. <br /> � '; <br /> � ICT 99184 <br /> , 15300 - 1 <br />� � � <br /> I <br /> � <br /> � <br />