Laserfiche WebLink
• SECT 'ON 15400 - PLUMBING <br /> � <br /> PAR 1 - GENERAL <br /> l.l WORK INCLUDED <br /> A. This section includes requirements for: <br /> l. Cleanouts. <br /> 2. Shock absorbers. <br /> 3. Trap primers. <br /> I 4. Sanitary sewer service connection. <br /> � <br /> �1.2 SUBMITTALS <br /> ; A. Submit with maintenance manuals : <br /> 1. Product Data for piping materials including manufacturer, <br /> � conformance with applicable standards and service. <br /> PAR 2 -PRODUCTS <br /> � �2.1 ACCEPTABLE MANUFACTURERS <br /> � <br /> ; A. Acceptable manufacturers are indicated in subsequent para�aphs. <br /> � <br /> �2.2 SHOCK ABSORBERS <br /> � <br /> A. Acceptable manufacturers: Josam, Wade, J.R. Smith, Precision <br /> Products,Zurn, or Sioux Chief. <br /> B. Refer to drawings for placement and size of shock absorbers. <br /> 23 CLEANOUTS <br /> A. Acceptable manufacturers: Josam, Wade, J.R. Smith, or Zurn. The <br /> following model numbers listed are Zurn. <br /> B. Exterior: ZN-1402-BP-HD cast iron cutoff ferrule with round <br /> nickel bronze scoriated frame and cover, secured. <br /> �; C. Finished concrete floor: ZN-1400-�ID-BP inside caulk round <br /> �� nickel bronze scoriated frame and cover. <br /> � <br /> ICT 9 184 <br /> 15400 - 1 <br />