My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38113 MARKET SQ
Zephyrhills
>
Building Department
>
Building Plans
>
38113 MARKET SQ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2017 8:01:03 AM
Creation date
5/13/2017 7:28:02 AM
Metadata
Fields
Template:
Building Plans
Street #
38113 MARKET SQ
Location
MARKET SQ
Contractor
HINSON BUILDING CORP
Description
INTERIOR BUILD OUT FOR MRI UNIT
Owner
FLORIDA MEDICAL UNIT
Building Plans - Permit #
8889B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i I <br /> I <br /> D. Resilient tile floor: ZN-1400-X-BP inside caulk round nickel • <br /> bronze scoriated frame and cover, secured. i <br /> � <br /> E. Carpet: ZN-1400-CM-BP inside caulk round nickel bronze i <br /> scoriated frame and cover; provide carpet marker and permanei t <br /> marker in ceiling above. I <br /> F. Wall: ZN-1440-1 cast iron caulking ferrule with Nikaloy smoolt�h <br /> round frame and cover. i <br /> i <br /> G. Wall: Z-1446-BP cast iron cleanout with bronze plug and ro�d <br /> stainless steel cover. I <br /> H. Access covers: Minimum size 12" x 12" located for access to <br /> valves, shock absorbers,trap primers, wall cleanouts, etc. i <br /> i � <br /> I. Furnish cleanouts occurring in waterproof floors with clamping <br /> devices. j <br /> i <br /> 2.4 TRAP PRIlv1ERS � <br /> � <br /> A. Acceptable manufacturers: Josam, Zurn, Wade, J.R. Smith or � <br /> Precision Plumbing Products. � <br />� B. Construct trap primer valve of all bronze, chrome plated with <br />� removable operating parts, inte�al vacuum breaker, and gaske ed <br /> access cover. <br /> � <br /> 2.5 SANITARY SEWER SERVICE CONNECTION � <br /> i <br /> I <br /> A. Provide saddle, cut-in wyes, and connection to existing sewer. <br /> PART 3 -EXECUTION � <br /> 3.1 INSTALLATION AND TESTING <br /> A. Shock Absorbers: Install shock absorbers above ceiling, outsidi <br /> wall so access and maintenance can be performed without <br /> disturbing walls and non-liftouts ceilings. <br /> B. ' Cleanouts: Locate line size cleanouts, except 4" largest requirerl, at <br /> base of all soil and waste stacks, at all changes in direction and�in , <br /> straight runs. Ensure spacing in straight runs does not exceed 5�0 � <br /> feet inside building and 100 feet outside the building. Extend i � <br /> � <br /> ICT 99184 '' <br /> 15400 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.