My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (89)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (89)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2017 6:24:16 AM
Creation date
5/19/2017 1:46:19 PM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
DIAGNOSTIC SHELL ADDITION
Owner
EAST PASCO MEDICAL CENTER
Building Plans - Permit #
0090B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i I i _ - -- � :- _._ -- _ , <br /> I ?-.•���,,;_,,,.3 - _ <br /> � f , <br /> i <br /> i - <br /> � I <br /> i I <br />� i <br /> � <br /> i I CHANGES TO TI�DRAWIlVG5 . , - <br /> I il <br /> ' $heet A-2B=i reliminary Life Safety Plan First Floor: <br /> � <br /> Inco�rporate this drawing into the scope of work as a guideline for future scope of work for the � <br /> I faciliry ' <br /> � - <br /> Sheet A-3—Life Safety Plan Second Floor Plan: <br /> � <br /> � _ 1. Inco�r,porate the changes to the Life Safety Plan as indicated in the attached Sheet A-3,dated � <br /> � November 22,2000,Delta No.5. <br /> � . i heet A-3B—Preliminary Life Safety Plan Second Floor Plan: ' <br /> I , <br /> � . Inco ,rporate this drawing into the scope of work as a guideline for future scope of work for the <br /> facility. . <br /> C . <br /> Sheet A-4A i Phasing Plans: <br />' � � <br /> Inco , orate the u dated hasin lans for both floors for Phase 2 and Phase-3 as indicated in the <br /> � <br /> P P gP <br /> attachi d sheet A-4A, dated November 22, 2000,Delta No.5. . <br /> � � . <br /> Sheet A-4B—Preliminary Life Safety Plan Third Floor Plan: , <br /> , ;I , <br /> e f rk a 'deline <br /> 1. Incor�orate this drawing into the scop o wo as gui for future scope of work for the <br /> � facih . <br /> 'I ty . - , <br /> �heet A-9—IVoted and Dimensioned Second Floor Plan: <br /> � Inco orate the changes for stair"E"as indicated in the attached sheet A-9,dated November 22, <br /> ' 2000 �elta No.5. . <br /> iheet A-13�Wall Sections: <br /> 1. Inco��orate Detail5/A-13 as indicated in the enclosed drawing A-13,dated November 22,2000, � <br /> Delta�Vo. 5. _ � <br /> I i <br /> ,1I heet A-14—yVall Sections: � <br /> I <br /> Inco �orate Detail 7/A-14 as indicated n the enclosed A-14,dated November 22,2000,Delta <br /> Na � , <br /> Incoz��orate the changes to window elevation as indicated in the enclosed diawing A-14, dated � <br /> � Novamber 22,2000,Delta No.5. ` <br /> i <br /> i heet A-20— ' eflected Ceiling Plan Second Floor Plan: - ' <br /> ' <br /> 1. Inco �rate�the changes to stair"E"as indicated in the enclosed drawing A-20, dated November _ <br /> , 22,2 00,Delta No. 5. � <br /> ; � , <br /> ; I ' <br /> �EVISION NO.5 PAGE 2 JOB NO. 99087.00 <br /> I il <br />
The URL can be used to link to this page
Your browser does not support the video tag.