Laserfiche WebLink
,I : <br /> . <br /> FORM 2-K O <br /> �Automatic Sprinkler Systems , <br /> Contractor's Material and Test <br /> Certificate for Under round Pi in (cont.) <br /> Test Descript(on (cont.) <br /> NYDROSTATlC,Hydrostatic tests shall be made at not less than 200 psi (13.6 bar}for two hours or 50 psi(3.4 bar) <br /> abo'�ve static pressure in excess of 150 psi(7U.2 bar)for two hours. <br /> �FAK4GE:New pipe laid with rubber gasketed joints shall, if the workmanship as satistactory, have fittle or no leak- <br /> ag�at the joints.The amount of leakage at the joints shall not exceed Z qtr per hr. (1.$9 Uh) per 100 joints irre- <br /> spective of pipe diameter.The leakage shall be distributed over all joints. If such teakage occurs at a few joints the <br /> insi�allation shal! be considered unsatisfactory and necessary repafrs made.The amount of allowable fealcage speci- <br /> fiec�above may be intreased by 1 fl oz per in.valve diameter per hour(30 mL/25 mm/h)for each metal-seated � <br /> valye isofating the test section. If dry bar�el hydrants are tested with the main vaive open,so the hydrants are ' <br /> under pressure,an additional 5 oz per minute (150 mUmin) leakage is permitted for each hydrant. <br /> Flushing Tests � <br /> Netirv underground piping flushed according to standard. ❑ Yes ❑ No <br /> By i company) If no, explain. <br /> How flushing flow was obtained: �Public water ❑ Tank or reservoir p Fire pump <br /> Th�ough what type opening ❑ Hydrant butt ❑ Open pipe <br /> Lead-ins flushed act rdi to �Q Z standard � Yes l7 No <br /> By(company) � t'1 t If no,explain. <br /> Hoinr flushing flow was obtained Publit water ❑ Tank ar reservoir 0 Fire pump <br />! Through what type opening ❑ Y connection to flange and spigot � Open pipe <br /> Hydrostatic Test <br /> All lnew underground piping hydrqstatically tested at�0�psi {bar)for�hours <br /> joints covered? i�T Yes 8 No _ <br /> Leakage Test <br /> Total amount of leakage measured:_�gals(L) �.._hours <br /> Allowable leakage: gals(L) hours <br /> Hy{drants <br /> N�lmber installed:�_ T e and make: <br /> All operate satisfactorily? �Yes 0 No <br /> i Ca�introl Valves , - ,_,/ <br /> Water control valves left wide open? � Yes Lrf IVo <br /> if�o,state reason. � � �{� <br /> Hose threads of#ire depa�tment connections and hydrants inter- <br /> changeahle with those of fire department answering alarm? 0 Yes ❑ No <br /> Remarks Date left in service with all control valves open: <br /> I <br />� <br /> i <br /> I� Installing Contractor. JV. Gvn <br /> ' 'Signatures of Test Witnesses f , <br /> For property owner(signerJ), .,.��� .�-- Title S, ,��«.cfi�� Date� � ✓� � <br /> FOr sprinkler contractor(signed) Title Date <br /> � � PAGE2ot2 , <br /> Copyright��000 National Fire ProtecUon Association � <br /> � --- — - - •-- .._ <br />