My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18080
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2017 11:22:42 AM
Creation date
8/1/2017 11:22:39 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
17-18080
Building Department - Name
SETSER,KENT KYLE
Address
5731 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� _ . . . . � <br /> - �_^-..�� �i�� <br /> ; 4x� �, <br /> � <br /> r ,� <br /> ;• ; <br /> =.a� ���������� <br /> � <br /> 4. PRODUCT DESCRiPT10N: <br /> The following roof covers are mechanically attached or fully adhered to Approved substrates using fasteners, stress plates and <br /> adhesives,as outlined in the Limitations/Conditions of Use herein. <br /> ➢ Mule-Hide TPO-c membranes are nominal 45-mil(1.1mm)or 60-mil(1.5 mm)thick,polyester-scrim reinforced,thermoplastic <br /> olefin(TPO)single-ply roof inembranes. <br /> Y Mule-Hide TPO-c EXTRA membranes are nominal 72-mil (1.Smm) or 8d-mil (2.Omm� thick, polyester-scrim reinforced, <br /> thermoplastic olefin(TPO),single-ply roof inembranes. <br /> Y Mule-Hide TPO-c Fleece Back membrane is a nominal 45-mil (1.1mmj or 60-mil f 1.5 mm)thicl<, polyester-scrim reinforced, <br /> thermoplastic olefin(TPO)single-ply roof inembrane with a polyesterfleece backing. <br /> S. LIMITATIONS: <br /> 5.1 This is a building code evaluation. Neither Trinity�ERD nor Robert Nieminen,P.E.are,in any way,the Designer of Record <br /> for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design <br /> guidance unless retained specificallyforthat purpose. <br /> 5.2 This Evaluation Report is not for use in HVHZ. <br /> 5.3 Refer to a current Roofing Materials Directory for fire ratings of this product. <br /> 5.4 For steel deck installations,foam plastic insulation shall be separated from the building interior in accordance with FBC <br /> 2603.4 unless the exceptions stated in FBC 2603.4.1 or 2603.6 apply. <br /> 5.5 The roof system evaluation herein pertains to above-decic roof components. Roof decks and structural members shall be <br /> in accordance with FBC requirements to the satisfaction of the AH1. Load resistance of the roof deck shall be documented <br /> through proper codified and/or FBC Approval documentation. <br /> 5.6 For recover installations,the existing roof shall be examined in accordance with FBC 1510. <br /> 5.7 For mechanically attached insulation or membrane or strip-bonded insulation, the maximum design pressure for the <br /> selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Chapter 16. Zones <br /> 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure <br /> criteria. Commonly used methods are RAS 117, RAS 137,FM LPD51-29 and ANSI/SPRI WD1. Assemblies marlced with an <br /> asterisk*carry the limitations set forth in Section 2.2.1.5.1�a}of FM LPDS 1-29 for Zone 2/3 enhancements. <br /> 5.8 For assemblies with all components fully 6onded in place,the maximum design pressure for the selected assembly shall <br /> meet or exceed critical design pressure determined in accordance with FBC Chapter 16. No rational analysis is permitted <br /> for these systems. <br /> 5.9 For mechanically attached insulation or membrane over existing roof decks,fasteners shall be tested in the existing deck <br /> for withdrawal resistance. A qualified design professional shall review the data for comparison to the minimum <br /> requirements for the system. Testing and analysis shall be in accordance with TAS 105 or ANSI/SPRI FX-1. <br /> 5.10 For bonded insulation or membrane over existing substrates in a re-roof(tear offl or recover installation,the existing deck <br /> or existing roof surface shall be examined for compatibility with the adhesive to be installed. If any surface conditions <br /> exist that bring system performance into question, field uplift testing in accordance with ASTM E907, FM LPDS 1-52, <br /> ANSI/SPRI IA-1 or TA5 124 shall be conducted on mocic-ups of the proposed new roof assembly. <br /> 5.11 For bonded insulation or membrane over existing substrates in a recover installation, the existing roof system shall be <br /> capable of resisting project design pressures on its own merit to the satisfaction of the AHJ,as documented through field <br /> uplift testing in accordance with ASTM E907,FM LPDS 1-52,ANSI/SPRI IA-1 or TAS 124. <br /> 5.12 Metal edge attachment(except gutters),shall be designed and installed for wind loads in accordance with FBC Chapter 16 <br /> and tested for resistance in accordance with AN51/SPRI ES-1 or RAS 111,except the basic wind speed shall be determined <br /> from FBC Figure 1609. <br /> 5.13 All products in the roof assembly shall have quality assurance audit in accordance with the FBC and F.A.C.Rule 61G20-3. <br /> Exterior Research and Design,LLC. Evaluation Report M15060.06.09-R3 <br /> Certificate of AathorizutFon#9503 ' FL12772-R3 <br /> Revision 3:03/18/2015 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.