Laserfiche WebLink
, . <br /> . -�.,. <br /> ��-....,,�r� `, <br /> F� <br /> � <br /> � �{ji {j{� n ¢� <br /> �i�•4 V �U�U�}��e.� <br /> 6. INSTALLATION: <br /> 6.1 Mule-Hide TPO-c Single Ply Roof Systems shalf be installed in accordance with Mule-Hide Products Co,, Inc. published <br /> installation instructions,subject to the Limitations/Conditions of Use noted herein. <br /> 6.Z System attachment requirements for wind load resistance are set forth in Appendix 1. "MDP" = Maximum Design <br /> Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing <br /> pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FBC 1609 for <br /> determination of design wind pressures. <br /> 6.3 For mechanically fastened membrane systems (Type D) over profiled steel deck, membrane shall be installed running <br /> perpendicular to steel deck flutes. <br /> 7. BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. <br /> 8. MANUFACTURING PLANTS: <br /> Contact the noted QA agency for information on product locations covered to F.A.C.Rule 61G20-3 QA requirements. <br /> 9. quaun�AssueaNCE ENrirv: <br /> UL,LLC—qUA4625;(414)248-6409;karen.buchmann@ul.com <br /> -THE 18-PAGES TNAT FOLLOW FOAM PART OF TH1S EVALUAT/OIi1 REPORT- <br /> Exterior Research and Design,LLC. Evaluation Report M15060.06.09-R3 <br /> tertificate ojAuthorizotion�f9503 FL12772-R3 <br /> Revision 3:03/18/2015 <br /> Page 4 of 4 <br />