Laserfiche WebLink
removed. SPC,suppliecs,and insurance carriers shall not be responsible for the any loss or use of any facility or any intecior or exterior <br /> damages of any kind resulting fi•om lealcs,should they occur. SPC and its insurance carciers are not responsible for any walls,siding or i <br /> window leaks,those are to be repaired by others, nor is the contractor responsible for the disconnecting,reconnecting,reworking of replacing <br /> of any satellite dishes,cables, lightning protection,electrical lines, lightning, plumbing, etc. This worl<needs to be done by others and paid by <br /> the owner. SPC, insurance carriers are not responsible for Freon lines,electrical conduit/lines, plumbing or any other lines that are installed <br /> too close to the roof sheathing and or not instafled properly to building code. SPC shall not be held liable or responsible for any injuries to <br /> anyone other than its employees on the job site nor can SPC be held respons�ble for any damages or injuries by anyone falling through the roof , <br /> due to rotten or damaged roof decicing. <br /> I5. ROOF DRAINAGE. A roof drainage is determined by the design and original construction of the building, SPC does not guarantee that <br /> water will not remain on a flat roof. Any damage due to ponding water is not the responsibility of SPC or its insurance carriers. It is the <br /> responsibility of the Customer to notify SPC of any known roof drainage problems on the low slope or flat roof areas. If after the Contractor <br /> removes the roof inembrane,the roof deck is found to not have the repaired slope for positive drainage, a tapered insulation system wifl be ' <br /> installed to the roof deck to help enhance proper drainage. This will be billed at an additional charge and Customer agrees to pay SPC his <br /> normal free charged to rectify the problem. It is agreed by Customer that this work will be done immediately in order to watertight the roof as <br /> quickly as possible due to the roof being a low slope or flat roof. If the substrate roof condition results in ponding pursuant to the Florida <br /> Building Code and modifications are required to correct the roof so ponding will not occur. � <br /> 16. ROOF DECKING. If we discover that roof decl<ing is not properly nailed to code,we will bring it up to current building code. <br /> Replacement of roof decicing will be made not to exceed four sheets of plywood.Over four will be charged to the customer. <br /> 17. WARRANTY WORK. SPC is responsible under warranty to repair or replace at the company's discretion the roofing membranes and <br /> associated flashings which are causing the leak. SPC is not responsible for any damage from normal loss of granules from the roof. Work <br /> done or attempted to be done,on this roof by someone other than SPC or authorized agents relieves the warrantor from any further obligation. <br /> All damages to embodied work in our contract caused by others will be repaired by us and charged to you at scheduled rates. Failure to keep <br /> gutters,down and roof clean may void the warranty. SPC will provide a five year labor against leaks or workmanship and on steep, slope <br /> shingle,tile and metal roof.One year warranty due to workmanship on flat roof Roof repairs have six months warranty. <br /> 18. LECAL FEE AND COLLECTLON. Customer agrees to pay all collection fees and charges whether or not a suit is necessary including <br /> but not limited to all legal and attorney's fees as well as filing fees and interest of any miscellaneous costs incurred to collect the debt should <br /> the homeowner default in payment of any agreed upon installment payments due hereunder the entire principal balance shall at the option of <br /> SPC make it become immediately due and payable without notice.A finance charge of 18% APR or the highest rate permissible <br /> by law will be added to the balances over 10 days past due after completed worl<or passed inspection. <br /> 19. FLORIDA STATUT�725.06. For and in consideration of$10 given by SPC to Customer and already reflected in the Agreement price, <br /> the Customer shall defend, indemnify,and hold SPC, its officers,directors, agents and employees(indemnitee/indemnitees)harmless from and <br /> against and al] claims,demands, losses,damages liabilities, expenses,costs, including attorney's fees,costs and expenses of investigation, <br /> penalties, interest and amounts paid m settlement incurred or to be incurred by SPC arising out of relating to, or resulting from 1.personal <br /> in�uiy 2. wrongful death,3. property damages, including claims for those damages caused partly or wholly as a result of the negligence or <br /> wrongful acts of any of the indemnitees if the damages claimed relate to or arise out of, or are connected with the Agreement or the actions <br /> necessary to perform same. The Customer's duty under this provision is limited to a total of ONE MILLION AND NO/000($1,000,000) <br /> dollars for all damages, including costs and attorney's fees per occurrence for any single claim or suit.This Agreement shall be governed by <br /> the laws of the State of Florida. Venue of any litigation or arbitration arising out of this Agreement shall be in Hillsborough County unless <br /> parties hereto mutually agree otherwise. Should Contractor employ an attorney to institute litigation or arbitration to enforce any of the <br /> provisions hereof,to protect its interest in any matter arising out of or related to this Agreement, SPC shall be entitled to recover from the <br /> Customer all of its attorney's fees,costs,and expenses incurred herein, including attorney's fees, costs and expenses incurred at mediation, <br /> administrative,appellate or banl<ruptcy proceedings. <br /> 20. TERMS. Payment is to be made as follows• 50%down payment upon acceptance of the contract and the balance is due upon the <br /> completion of the job. Credit card fees are paid by the Customer. <br /> 21. CONTRACT PRICE. $ 10,200 <br /> 22. PROGRESS PAYMENT. <br /> A.$5,100 -first payment—down payment is required upon signin�the contract. Buyer receives copy of this contract. <br /> b. $5,100 -final payment—upon completion and inspection. <br /> 23. BUYER'S RIGHT TO CANCEL.This is a home solicitation sale,and if you do not want the goods or services,you may cancel this <br /> agreement by providing written notice to the seller in person,telegram or by mail. This notice must indicate that you do not want the goods or <br /> services and must be delivered or postmarked before midnight of the third business day after you sign this agreement. If you cancel this <br /> agreement,the seller may not I<eep all or part of any cash down payment." <br /> For contracts greater than$2,500.00 <br /> ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW(SECTIONS 713.001-713.37,FLORIDA STATUTES). <br /> THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL <br /> HAVE THE RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN <br /> AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR SLJBCONTRACTOIt FAILS TO PAY SUB-CONTRACTORS, —� <br /> SUBCONTI2ACTORS OR MATERIAL SUPPLIE�iS,THOSE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR <br /> PROPERTY FOR PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY <br /> YOUR CONTRACTOR,YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS A LIEN IS <br /> FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR,MATERIALS,OR OTHER <br /> SERVICES THAT YOUR CONTI2ACTOR OR SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, <br /> YOU SHOULD STIPUI,ATE IN THIS CONTRACT THAT �EFORE ANY PAYMENT iS MADE, YOUR CONTRACTOR IS <br /> REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS <br /> PROVIDED TO YOU A"NOTIC�TO OWNER". FLORIDA'S CONSTRUCTIOIV LiEN LAW IS COMPLEX AND IT IS <br /> RECO1ViM�NDED THAT YOU CONSULT fiN ATTORNEY. I <br /> FLORI�A HOMEOWN�RS' C�NSTRUCTION RECOVER'Y FUND <br /> PAYMENT MAY BE AVAILABLE FROM THE FLORIDA I�OMEOWNER'S CONSTRUCTION RECOVERY FUND 1F YOU• <br /> LOSE MONEY ON A PROJECT I'ERFORMED UNDER CONTRACT,WHERE THE LOSS RESULTS FROM SPECIFIED <br /> VIOLATIONS OF FLORIDA L,�W BY A LICENSED CONTRACTOR. FOR INFORMATION ABOUT THE RECOVERY FUND <br /> AND FIL,ING A CLAIM,CONTACT THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD AT THE TELEPHONE <br /> NUMBER AND ADDRESS. FLORIDA CILB, 1940 N. MONROE ST.,TALLAHASSEE, FL 32399.Telepho e: 850-487-1395 <br /> ;� � o <br /> s�ott Post <br /> J � ���►��� ��� <br /> � <br />