My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18467
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 10:17:06 AM
Creation date
12/8/2017 10:16:35 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
17-18467
Building Department - Name
WHALEN,STEPHEN
Address
39027 6TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IKO , <br /> � Installation Instructions for <br /> Asphalt Shingles <br /> Page 3 of 5 <br /> IKO Laminated Shingles Application Instructions <br /> (ASTM D3161, Class F—Cambridge, Cambridge HD, and CRC Biltmore AR) <br /> NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED <br /> APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION <br /> CONFLICT,THESE INSTRUCTIONS WILL GOVERN. <br /> ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. <br /> UNDERLAYMENT:Applied in accordance with building code requirements. For areas where the roof slope is <br /> less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code <br /> requirements, the first sheet overlapping the eave protection by 19", followed by full 36"widths overlapping <br /> each preceding course by 19"or other Approved underlayments in accordance with the qualified application <br /> instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of <br /> underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top <br /> of any underlay along rake edges and directfy to the deck along eaves in accordance with building code <br /> requirements. <br /> NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads, long <br /> enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nail line 7-3/8" <br /> below the top edge, approx. 1"and 13" in from each end. Drive nails straight so that nail head is flush with, <br /> but not cutting into shingle surface. <br />� MAILING ON STEEP SLOPES: For steep slopes of 21"per foot(60°)or more, use 6 nails per shingle placed <br /> as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each <br /> shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt <br /> plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. <br /> Apply plastic cement in moderation since excessive amounts may cause blistering CAUTION. Shingles <br />, should seal to the underlying course when the factory applied asphalt sealant is sufFiciently warmed by the <br /> heat of direct sunlight. <br /> EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8" <br /> NAILING-STEEP SLOPES APPLICATION <br /> Use six nails as shown. <br /> f <br /> 7 3/S" <br /> —► �— 1�� �,. � i ► ��� �,. � � �„ _► . <br />' � NAIL LINE � <br /> s 3�a t - --- -- - ------ --- - --- --- <br /> 1 ` ` �' <br /> NAILS CEMENT <br /> PROPERAPPLICA710N REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UPJDERLAY PORTIONS OFTHE SHINGLE <br /> PRI Construction Materials Technologies,LLC. 6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:materialstesting@pricmt.com WebSite:hltp:lN+ww.pricmt.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.