My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18467
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 10:17:06 AM
Creation date
12/8/2017 10:16:35 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
17-18467
Building Department - Name
WHALEN,STEPHEN
Address
39027 6TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IKO . <br /> � Installation Instructions for <br /> Asphalt Shingles <br /> Page 4 of 5 <br /> IKO Hip and Ridge 12 Application Instruct�ions <br /> (ASTM D3161, Class F— IKO Hip and Ridge 12) <br />' NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED <br /> APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION <br /> CONFLICT,THESE INSTRUCTIOiVS WILL GOVERN. <br /> Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are <br /> designed for a 5 1/8"(130 mm)exposure. (For a neater appearance, the top of each side of each piece has <br /> been factory trimmed on a 1"(25 mm)taper(see drawing). Bend each piece over the hip or ridge, and nail 5 <br /> 5/8" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing each piece 5 1/8" (130 mm). <br /> Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge <br /> pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end <br /> opposite to the prevailing wind direction and continue to the other end. Note: To obtain a three-dimensional <br /> effect, (which is recommended, but not required), apply hip and ridge shingles double thickness by stacking 2 <br /> pieces on top of one another, the lower piece extending about 3/4" (19 mm)further than the top piece(see <br /> diagram).The final shingle should be set in cement,and the exposed nail heads of the final shingle should be <br />� covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for <br /> easier bending. <br /> NOTE:SHINGLES MUST BE APPLIED PROPERLY.THEYARE DESIGNED FOR USE AS HIP AND RIDGE <br /> SHINGLES ONLY, AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS. WE ASSUME NO <br /> RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO <br /> PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER <br /> VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTYSTANDARDS REQUIREMENTS.REVIEW <br /> ALLAPPLICABLE BUILDING CODES, MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR <br /> TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. <br /> 3!4• 1 ` 1� <br /> (19 mm) �l ��� <br /> �I ''��\ / TAPEA CUT <br /> 5 1I8' � \ � <br /> I Q30mm) I �� � •� <br /> ��` � � <br /> � <br /> I 6 3!B' <br /> (762 mm) <br /> PRI Construction Materials Technologies,LLC. 6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:materialstesting@pricmt.com WebSite:hltp:l/www.pricmt.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.