Laserfiche WebLink
Report of Concrete Slab Evaluation RE&A Project No. 2825-15-023-SE-A <br /> Existin�TKM Aviation Hangar June 27 2017 <br /> • Based on the information provided by representatives of TKM and CANCO, we <br /> understand that as part of site preparation, 4 to 5 inches of top soil were removed and 1 <br /> foot of compacted fill was added and was left to set for about 2 months before concrete <br /> was poured. , <br /> • Once the concrete was poured (approximately 1 year ago) for a 6-inch thick concrete <br /> slab, the expansion joints to a depth of little over 1 inch were saw-cut on the same da.y, <br /> and the slab was left to set for about 7 to 8 months. The exterior and interior slabs were <br /> pinned together. <br /> • Based on the information provided by A-1 Block Corporation, the concrete mix design <br /> used for the project, Mix ID 3057FNA, was designed to have slump range of 4 to 6 and <br /> strength of 3000 psi. I <br /> • Based on the information provided by Taylor Testing Laboratories, the 7-day and 28-day <br /> compressive strengths of the 3 sets collected during concrete placement were in the range <br />� of 2,770 to 3,790 psi and 4,670 to 4,870 psi, respectively. ' <br /> • We also understand that the fmal construction at the site was completed earlier this year, <br /> and the epoxy coating was applied on the slab in February of 2017. <br /> • The residents moved in and sta.rted operations in March of 2017, which was when they <br /> started noticing the cracks through the epoxy. <br /> Summary of RE&A Field Explorations <br />' • In order to evaluate the concrete and soil conditions, RE&A performed a series of nine <br /> (9) concrete cores — six (6) cores of 6 inch diameter, and three (3) cores of 3 inch <br /> diameter— in the distressed areas on May 2nd and 4�, 2017. Four (4) of the 6-inch core <br /> locations were hand augered, supplemented with dynamic cone penetrometer (DCP) <br /> testing. Please refer to attached Test Location Plan (Sheet 1) in the Appendix for <br /> approximate test locations. <br /> 3 � <br /> �� <br />