My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18654
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 1:56:20 PM
Creation date
5/2/2018 7:19:55 AM
Metadata
Fields
Template:
Building Department
Company Name
HARBOR FREIGHT
Building Department - Doc Type
Permit
Permit #
17-18654
Building Department - Name
ZEPHYR II LLC
Address
5915 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rw�,oe,w� <br /> s�Mac�ER <br /> � Contractor's Material and Test Certificate for Under round Pi in �"��ON�°"� <br /> � g P g <br /> A.Procedure Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by an <br /> owner's representative.All defects shall be corrected and system left in service before contractor's personnel finally leave the job.A <br /> certificate shall be filled out and signed by both representatives.Copies shall be prepared for approving authorities,owners,and <br /> contractor.It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty <br /> material,poor workmanship,or failwe to comply with approving authority's requirements or local ordinances.All"No"answers <br /> shall be explained in the Comments portion of this forcn. <br /> G. Flushing Tests <br /> Property Name: ��bos- �PxcxY�ct- Taa ls 1.New underground pipuig flushed according <br /> Property Address: S�}'3� (�' r ra 11 't�\o� <br /> to �`� a� standard? �Yes ❑No <br /> Date: a.Flushing conducted by(company): �x�e-¢1Cvs,,1 �-'��G <br /> B.Plans b.Flushing flow obtained from: <br /> 1 Accepted by approving authorities(names): ��blic water ❑Tank or reservoir ��e pump <br /> c.Type of opening: ❑Hydrant butt C(Open pipe <br /> Ci�r o� �„�h��•=-h�}� 3.Lead-ins flushed according to <br /> ���C'n 62� standard? ❑Yes ❑No <br /> 2.Address: <br /> 3 Installation conforms to accepted plans �'es ❑No a.Lead-ins flushed by(company): 3e�GCa.� `��Ce' <br /> 4 Equipment used is approved C✓1 Yes ❑No b.How flushing flow for lead-ins was obtauied: <br /> C. Instructions ❑Public water ❑Tank or reservoir ❑Fire pump <br /> 1.Has person in charge of fire equipment been c.Type of opening: ❑}'.connection to flange&spigot <br /> instructed as to location of control valves and / C�Open pipe <br /> care and maintenance of this new equipment C�Yes ❑No K Hydrostatic Test <br /> 2.Have copies of appropriate instructions andf�'e 1.All new underground piping hydrostatically tested at <br /> and maintenance charts been left on premises�Yes ❑No 'Z�l7 psi for 2 hours <br /> D. Location 2.All joints covered? r9'Yes ❑No , <br /> System supplies buildings: L Leakage Test <br /> E.Underground Pipes and Joints 1 Total amount of leakage measured gal hours <br /> l.Pipe types and class: G�'(DD '�R-1L1 ��VC� <br /> 2.Allowable leakage gal hours <br /> 2. Jomt type(s): YYl S J.Hydrants <br /> / 1.Number installed� ,type and make� <br /> 3 Pipe confonns to1��F�� bt�l standard�Yes ❑No 2.All operate satisfa orily? {�Yes ❑No <br /> � K Control Valves � <br /> 4.Fittings confonn to���� a�( standard0 Yes O No 1.Water control valves left wide open? C�Yes ❑No <br /> 5 Jomts needing anchorage clamped,strapped or 2.Hose threads of fire departrnent connections <br /> � � and hydrants interchangeable with those of / <br /> blocked in accordance with�as�andard Cb Yes ❑No fire department answering alann7 �Yes ❑No <br /> F.Test Description L Commetets(I'his section is for additiona!explanation and <br /> Flushing: Flow the required rate until water is clear as notes. A!! "No"answers n:ust be explained{rere.)` <br /> indicated by no collection of foreign material in bwlap bags at <br /> outlets such as h drants and blow-of�s. Flush at flows not less <br /> Y <br /> than 390 gpm for 4-inch pipe,880 gpm for 6-inch pipe, 1560 <br /> gpm for 8-inch p�pe,2440 gpm for 10 inch pipe,and 3520 gpm � <br /> for 12-inch pipe.When supply cannot produce stipulated flow � <br /> rates,obtain maximum available. <br /> Hydrostatic: Hycirostatic tests shall be made at not less � <br /> than 200 psi for two hours or 50 psi above static pressure in ` <br /> excess of 150 psi for two hours. ` <br /> Leakage. New pipe laid with rubber gasketed joints shall,if the <br /> workmanship is satisfactory,have l�ttle or no leakage at <br /> the jomts. The amount of leakage at the joints shall not <br /> exceed 2 qts per hr per 100 joints irrespective of pipe Date left in serv�ce: <br /> diameter.The leakage shall be distributed over all joints.If ❑Check here if comments continue on other side of this forn► <br /> such leakage occurs at a few joints the mstallation shall be M. Signatures <br /> considered unsatisfactory and necessary repairs made. The 1.Name of Installmg Contractor:��ez� �ir� ���.:1-ipr <br /> amount of allowable leakage specified above can be 2.Tests witnessed by <br /> increased by 1 t]oz per inch valve diameter per hr for each Property Owner(signed): <br /> metal seated valve isolatmg the test section.If dry barrel Title: Date: <br /> hydrants are tested with the main valve open,so the hydrants <br /> are under pressure,an additional 5 oz per minute leakage is I�istalling Contractor(signed): <br /> pecmitted for each hydrant. Title: Date: <br /> 02007 National Fire Sprinkler Association,40 Jon Barrett Road Patterson,NY 12563(845)878-4200 Fonn 13-U Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.