NATIONAL <br /> Contr - tors Material and Test Certificate for boveground Piping F�� <br /> ��� <br /> 'A.Procedure Upon completion of work,inspection and tests shall be made by th�contractor's representative and 'O'��1ON'�"` <br /> witnessed by an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job.A <br /> certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners and contractor. It is <br /> understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material,poor workmanship,or failure <br /> to comply with approving authority's requirements or local ordinances.All "No"answers shall be explained in the Comments portion of this form. <br /> Property Name: F�.a"bo� �a��Wc �b Address: SA3� �(Q-11 �$\ Date: <br /> � O.Tests <br /> B.Plans 1 All piping hydrostatically tested at z0� psi for z hours <br /> 1.Accepted by Approving Authorities(Names):(�',a,��„�n���� 2. Dry piping pneumatically tested C�Yes ❑No <br /> 2.Address: � 3.Equipment operates properly r�Yes ❑No <br /> 3.Installation conforms to accepted plans r,l1'es ❑No 4.Do you certify as the sprinkler contractor that additives and <br /> 4 EGuipment used is approved r�Yes ❑No corrosive chemicals,sodium silicate or derivatives of sodium <br /> C.Instructions silicate,brine,or other corrosive chemicals were not used for <br /> 1.Has person in charge of fire equipment been testing systems or stopping leaks? �Yes ❑No <br /> instructed as to location of control valves and � <br /> care and maintenance of this new equipment uYes ❑No 5.Drain Test: <br /> a.Static pressure reading of gage <br /> 2.Have copies of the following been left on the premises: located near water supply connection � psi. <br /> a.System components instructions u�Yes ❑No b.Residual pressure with <br /> b.Care and maintenance instructions [�es ❑No valve in test connection open wide ss psi. <br /> c.NFPA 25 [�Yes ❑No 6.Underground mains and lead in connections to <br /> D.Location of system-Supplies building(s): risers flushed before connection made to sprinkler <br /> E.S rinklers piping and verified by copy of form No. 13-U �Yes ❑No <br /> Make Model Year Made Orifice Quantity Temperature 7,Flushed by installer of underground piping O Yes ❑No <br /> 8.If powder driven fasteners are used in concrete, <br /> � has representative sample testing been satisfactorily / <br /> �L S(9�S Zb�z �1. �2a 2�a dYes ❑No <br /> completed? <br /> P.Blank Testing Gaskets <br /> 1 Number used: <br /> 2.Locations: <br /> 3.Number removed: <br /> Q.Welded Piping-If welded piping was used in the system, <br /> F.Pipe and Fittings complete the following: <br /> 1.Type of Pipe: `S3�V- SC�4 y� 1.As the sprinkler contractor,were welding procedures in <br /> 2.Type of Fittings: �c� W lrl. -M�� compliance with the requirements of at least AWS B2. <br /> G.Alarm Valve or Flow Indicator ASME Section IX or other required standards Yes ❑No <br /> 2.Was welding performed by welders qualified in <br /> (�� compliance with the requirements of at least AWS B2J, <br /> � \�L <br /> ASME Section IX or other required standards I�Yes ❑No <br /> H.Dry-Pipe Valve 3.Do you certify that welding was carried out in compliance <br /> Make,Model and Serial Number: with a documented quality control procedure to insure that <br /> all discs are retrieved,openings in pipe are smooth,slag and <br /> I.Quick Opening Device(Q.O.D.) other welding residue are removed,the intemal diameters of <br /> Make,Model and Serial Number: piping are not penetrated,completed welds are free from cracks, <br /> J.Dry-Pipe System Operating Test Without Q.O.D. incomplete fusion,surface porosity greater than 1/16 inch in <br /> 1.Time to trip through test connection*: diameter,undercut deeper than the lesser of 25%of the wall <br /> 2.Water pressure psi. Air pressure psi. thickness or 1/32 inch,and the completed circumferen�al <br /> 3.Trip point air pressure psi. <br /> 4.Time water reached test outlet*: butt weld reinforcement does not exceed 3/32 inch?�Yes ❑No <br /> 5.Alann operated properly ❑Yes ❑No R.Cutouts(Disks) <br /> K.Dry-Pipe System Operating Test With Q.O.D. <br /> Do you certify that you have a control feature to <br /> 1.Time to trip through test connection*: ensure that all cutouts(disks)are retrieved? �Yes ❑No <br /> 2.Water pressure psi. Air pressure psi. S.Hydraulic Data Nameplate Provided C�Yes ❑No <br /> 3.Trip point air pressure psi. T.Date left in service(with all control valves open): <br /> 4.Time water reached test outlet*: U.Signatures <br /> 5.Alarm operated properly ❑Yes ❑No 1 Name of sprinkler contractor:���^Q\ ��� �o��`�?'� <br /> L.Deluge and Preaction Valves 2.Tests witnessed by <br /> 1.Make&Model: For property owner(Signed): <br /> Title: Date: <br /> 2.Operation: ❑Pneumatic ❑Electric ❑Hydraulic For sprinkler contractor(Signed): <br /> 3.Piping and detecting media supervised ❑Y.es ❑No Title: Date: <br /> 4.Does valve operate from manual trip and/or V.Comments(This section is for additional explanation and notes. All <br /> remote control stations ❑Yes ❑No "No"answers must be explained here.) <br /> 5.Is there an accessible facility in each <br /> circuit for testing OYes ❑No <br /> 6.Does each circuit operate supervision loss alarm OYes ❑No <br /> 7.Does each circuit operate valve release ❑Yes ❑No <br /> 8.Maximum time to operate release: <br /> M.Pressure Reducing Valve <br /> 1.Location and Floor: 1 <br /> 2.Make and Model: <br /> 3.Setting: Static Pressure: Inlet _psi, Outlet _�si <br /> 4.Residual Pressure(Flowing):Inlet psi, Outlet psi <br /> 5 Flow Rate: gpm <br /> N.Test Description <br /> j�Hydrostatic: Hydrostatic tests shall be made at not less than 200 psi for <br /> two hours or 50 psi above static pressure in excess of 150 psi for two <br /> hours. Differential dry-pipe valve clappers shall be left open during test <br /> to prevent damage.All aboveground piping leakage shall be stopped. <br /> Pneumatic: Establish 40 psi air pressure and measure drop. Test <br /> pressure tanks at normal water level and air pressure and measure air <br /> pressure drop. In both cases,the pressure drop shall not exceed 1'/�psi <br /> in 24 hrs. <br /> *Measured from the time the inspector's test connection is opened ❑Check here if comments continue on the reverse side of this form <br /> 02007 National Fire Sprinkler Association,40 Jon Barrett Road Patterson,NY 12563(845)878-4200 Form 13-A,Page 1 of 1 <br />