Laserfiche WebLink
i <br /> . � <br /> � . , <br /> ' INSTRUCTIONS—DEP FORM 62-621.300(4)(b) ; <br /> NOTICE O�INTENT(NOI)TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE�ROM LARGE , <br /> AND SMALL CONSTRUCTION ACTIVITIES ; <br /> Who Must File an NOI: i <br /> � <br /> You must file the NOI and obtain coverage under the Construction Generic Permit if you dischazge stormwater associated i <br /> I with Iarge or small construction activities to surface waters of the State,including thmugh a Municipa]Separate Storm i <br /> Sewer System(MS4),http://www.dep.state.fl.us/water/stormwater/npdes/docs/alI_ms4_by_county.pdf. ; <br /> � <br /> Where to File NOI: <br /> The Department encourages the electronic submission of NOIs using the Department's Interactive Notice of Intent(iNOI) , <br /> avaiIable at http://www.fldepportal.com/gol. NOIs also may be submitted by paper copy to the following address: <br /> NPDES StormwaterNotices Center,MS#3585 ' <br /> Florida Department of Environmental Protection <br /> 2600 Blair Stone Road � <br /> TalIahassee,Florida 32399-2400 i <br /> Permit Fee: II <br /> Permit fees for large and small construction activities to be covered under the generic permit are specified in paragraph 62- �I <br /> 4.050(4)(d),F.A.C.and available on our http://www.dep.state.fl.us/water/stormwater/npdes/fees.htm. You must submit the <br /> appropriate generic permit fee(either for large 5+acres$400 or small 1-4.99 acres$250 construction activities)with the I <br />� completed NOI to obtain coverage under the generic permit. Generic permit coverage will not be granted without � <br /> payment of the appropriate permit fee. <br />, If the NOI is submitted electronically,the permit fee must be paid on-line by credit card or check. If the NOI is submitted , ' <br />' using a paper copy,the permit fee must be paid by either check or money order made payable to. "Florida Department of <br /> Environmental Protection". <br />' Part I—Identification Number: , <br /> If you are renewing coverage,please enter the projecYs DEP idemification number(generic permit coverage number)if � <br /> lmown. If this is a new project without an ID number then Ieave this item blank.If you know your ERP Permit Number or , <br /> ERP Permitting Agency(if applicable}please identify it here,if not then leave these items blank. � <br /> ! <br />' Part II—Stormwater Pollution Prevention Plan(SWPPP)Completed: <br /> Check the box to indicate whether you have completed your Stormwater Pollution Prevenfion Plan. You must complete your <br />�� SWPPP attd be ready to implement it before submitting your NOI. ! <br /> i <br /> Part III—Applicant Information: ; <br /> � Item A.; Provide the legal name of the person,firm,contractor,public organization or other legal entity that owns or � <br /> ' operates the construction activity described in this NOI. The operator is the legal entity that has authority to control those ' <br /> ' activities at the project necessary to ensure compGance with the terms and conditions of the generic permit. <br /> , � <br /> tem B.: Enter the appropriate one Ietter code from the Iist beiow to indicate the legal status of the operator: � <br /> F=Federal;S=State;P=Private;M=Public other than federal or state;O=Other <br /> � ) <br /> � <br /> Items C.—F.: Provide the complete mailing address of the operator,including city,state and zip code. ' <br /> i <br /> Page 4 of 6 <br /> DEP Form 62-62 1 3 00(4){b) <br /> Effective Date: 02/10I10I5 � <br />