Laserfiche WebLink
, i <br /> � <br /> ,f � ,. � � � i <br /> _ a <br /> Items G.—J.: Provid'e the name,telephone and fax number(including area code)and E-mail address of the person � <br /> i <br /> authorized to submit this NOI on behaIf of the operator(e.g.,Jane Smith,President of Smith Construction Company on <br /> behalf of the operator,Smith Construction Company;John Doe,Public Works Director on behalf of the operator,City of <br /> Townsville;etc.). This should be the same person as indicated in the certificarion in Part VI. ' <br /> Part IV—ProjecUSite Location Information: I <br /> Items A.—E.: Enter the official or legal name and complete street address,including city,state and zip code of the project. � <br /> Do not provide a P.O.Box number as the street address. If it lacks a street address,describe the project site location(e.g., ' <br /> intersection of State Road 1 and Smith Street). <br /> Item F.: Enter the county in which the project is located. � <br /> I <br /> I <br />, Item G.: Enter the latitude and longitude,in degrees-minutes-seconds format,of the approximate center of the project. � <br />� <br /> Item H.: Indicate whether the project is located on Indian Country Lands. If the project is located on Indian Lands you � <br />� may not use this generic pecmit. Instead,you must apply to the http:J/cfpub.epa.gov/npdes/stormwater/const.cfin(EPA)for � <br /> coverage. � <br /> Item I.: Enter the appropriate five or six letter code from the list below to indicate the <br /> http://www.dep.state.fl.us/secretary/watman/default.htm in which yoar project is located: i <br /> NWFWIVID=Northwest FIorida Water Management District I <br /> SRWMD =Suwannee River Water Management District <br /> SFWMD =South Florida Water Management District , � <br /> SWFWMD=Southwest Florida Water Management District ' <br /> SJRWMD =5�John's River Water Management District I, <br /> Items J.—M.: Bnter the name,telephone and fax number(including area code)and E-mail address of the project contact � <br /> person. The project contact is the person who is thoroughly familiar with the project,the facts reported in this NOI and <br /> who can be contacted by the Department if necessary. � <br /> Item N.:Enter additional E-mail correspondence as needed to receive perniit reIated documentation.(Optional) i <br /> i <br /> Part V—ProjecdSite Activity Information: ' <br /> Item A.:Check the appropriate box to indicate whether the project involves large construction activity or small construction I <br /> acrivity. Check one box only. i <br /> � <br /> "Large Construction Activity"means construction acrivity resulting in the disturbance of five(5)or more acres of total]and i <br /> area. Large construction activity also ineludes the disturbance of less than five aeres of total land area that is part of a , <br /> larger common plan of deveIopment or sale such as a subdivision that will ultimately disturb five acres or more. <br /> i <br /> "Small Construction Activity"means construction activity resulting in the distvrbance of equal to or greater than one(1) <br /> acre and Iess than five(5)acres of total land azea. Small construction acrivity also includes the disturbance of less than one � <br /> acre oftotal land azea that is part of a lazger common plan of development or sale that will ultimately disturb equal to or ; <br /> greater than one acre and less than five acres. <br /> Item B.:Provide the approximate total area of land disturbance,in acres,that the project wilI invoIve from commencement � <br /> of construction through completion: � <br /> i <br /> Items C.-G.: Indicate the location where the Stormwater Pollution Prevenrion Plan(SWPPP)can be viewed. Provide the j <br /> address where the SWPPP can be viewed if other than as provided in Parts II or III of the NOI. Note that to be eligible for � <br /> coverage under the generic permit,the SWPPP must have been prepared prior to filing this NOL � <br /> Item H.: Enter the estimated construction start and completion dates in the MM/DD/YY format. <br /> Page 5 of 6 <br /> DEP Fonn 62-621,300(4)(b) <br /> Effective Date: 02/10J2015 <br />