Laserfiche WebLink
4 <br /> T�il'��T1��E�D <br /> 5. LIMtTAT10NS: <br /> 5.1 This is a building code evaluation. Neither Trinity�ERD nar Robert Nieminen,P.E.are, in any way,the Designer <br /> pf Record for any praject on which this Evaluation Report, or previous versions thereaf, isJwas used for <br /> permitting or design guidance unless retained specifically for that purpose. <br /> 5.2 This Evaluation Report is not for use in HVHZ jurisdictions. <br /> 5.3 Refer to a current UL Roofing Materials Directory for fire ratings of this product. <br /> 5.4 For stee!deck installatians,foam plastic insulation shall be separated from the building interior in accordance , <br /> with FBC 2603.4 unless the exceptions stated in FBC 2603.4.1 and 2603.6 apply. <br /> 5.5 The roaf system evaluation herein pertains to above-deck roof camponents. Raof decks and structaral <br /> members shall be in eccordance with FBC requirements ta the satisfactian of the Authority Having Jurisdiction. <br /> Load resistance of the roof cleck shall be dacumented through proper codified and/or FBC Approval <br /> dacumentatian. " <br /> 5.6 For recaver insta!lations,the existing roof shaU be examined in accordance with FBC 1511. <br /> 5.7 For mechanically atteched insulation or membrane or strip-bonded insulation,the maximum design pressure <br /> for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC <br /> Chapter 1G. Zones 2 and 3 shai!emplay an attachment density designed by a qualified design prafessiana(ta <br /> resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WDi, FM Loss Prevention Data <br /> Sheet 1-29, Roofing Applicatian Standard RAS 117 and Raofing Applitation Standasd RAS 137. Assembiies <br /> marked with an asterisk*carry the limitations set forth in Section 2.2.10.1 of FM Lass Prevention Data Sheet <br /> 1-29(January 2Q16}for�ane 2/3 enhancements. <br /> 5.8 Far assemblies with all components fully bonded in place, the maximum design pressure for the selected <br /> assembly sha!! meet or exceed critical design pressure determined in accordance with FBC Chapter 16. No <br /> rational analysis is permitted for these systems. ; <br /> 5.9 For mechanically attached insulatian or merr►brane over exisiing roof decks,fasteners shall be tested in the . <br /> existing deck far withdrawai resistance. A qualified design professional shali review the data for comparisan to <br /> the minimum requirements fpr the system. Testing and analysis shall be in accordance with ANSI/SPRI FX-1 or <br /> Testing Applitation Standard TAS 105. <br /> 5.10 For bonded insulation or membrane over existing substrates in a re-roof(tear offl ar recover installation,the <br /> existing deck or existing roof surface shafl be examined for compatibility w�th the adhesive to be installed. If <br /> any surface conditions exist that bring system performance into questian,field uplift testing in accordance with <br /> ANSIjSPRI !A-1,ASTM E9a7, FM Loss Preventian Qata Sheef 1-52 or Testing Applicatian Standard TAS 224 <br /> shall be conducted on mock-ups of the proposed new roof assembly. <br /> 5.11 For bonded insulation or membrane over existing substrates in a recover installation,the existing roof system <br /> shall be capabie of resisting project design pressures on its own merit to the satisfaction of the Authority � <br /> Having Jurisdiction, as documented through field uplift testing in accordance with ASTM E907, FM Lass � <br /> Frevention Qata Sheet 1-52 ar Testing Applicatian Standard TAS 124. <br /> 5.12 Metal edge attachment(except gutters),shall be designed and installed for wind loads in accordance with FBC <br /> Chapter 2b and tested for resistance in accordance with ANS1jSPR1 ES-1 ar Roofing Application Standard RAS <br /> 111,except the basic wind speed shall be determined from FBC Figure 1609.3(1),1609.3(2)or 1609.3(3). � <br /> 5.13 All praducts in the roof assembly shall have quality assurance in accardance with FAC Rule 61G20-3. � <br /> Esderi�r Research and Design,LLG Evatuation Report OI546.69.05-R28 <br /> Certificote of Authorization#9503 6T"EDITION(2017j FBC NON-HVHZ EVALUATION FL5293-R27 <br /> GAF EverGuard'�TPO 5ingle-Ply Roof Membrene Systems Revision 28:10/17/2017 <br /> Page 5 af 6 <br />