Laserfiche WebLink
3. i�'QRK IDES���'h'Yd.}N. The scape of work is contained and lirruted to the work <br /> contained in scope of work belaw.AII work performed by Contractor sha11 meet or exceed aII state <br /> and local building codes. <br /> Scope: <br /> - Remove and properly dispose af the existing roof system(s)down to the structural raof deck. <br /> - Visually inspect the p(ywood roof deck prior to new raof instaliatian. If any deficiencies are <br /> discovered, PRS will notify the owner immediateiy.This contract IiVCLUDES 160 sq fE of <br /> plywood replacement,Additional plywoad deck replacement will be performed at a rate of <br /> $4.25tsq ft, <br /> - New roof system will be installed to bypass the existing raof drains and go to an exterior <br /> gutter/downspout system. Existing roof drains will be capped off at the deck prior to new roof <br /> insfallation. <br /> - Pravide and install additional wood blocking along perimeter edge as needed ta mainfain insulation <br /> height. <br /> - Pravide and pre(iminary attach an 1/8"per foot tapered ISO system per the manufacture <br /> requirement.Average R-Value af this kapered package is 15.5. <br /> - Provide and ins#all a complete, rnechanically fasfened .060 TPCI roaf system per the manufacfure <br /> requirement. <br /> - Provide and instail ali necessary TPO flashings ta complete the raof system per the manufacture <br /> requirement. <br /> - Provide and install TPO walkway pads on the service side of the existing HVAC units per <br /> the manufacture requirement. <br /> - Fabricate and install new 24ga Kynar gutter system with downspouts to the perimeter of the <br /> building. Gutter and doxmspouts to be fabricated per the SMACNA specifications. <br /> - Lownspaeat locations ta be determined with the awner priar fo insfatlatian. <br /> - Fabricate and install perimeter edge metal along the gutter edge using TPO clad metal per <br /> the manufacture requirement. <br /> - Provide a 2-Year Contractor Workmansliip Warranty. <br /> - Provide a 15-Year Manufacture Warranty. <br /> - Provide a 20-Year"Finish Onfy"Mantafacfure V�/arranty on aIl metal wark with a Kynarfinish. <br /> 4. TIlO�IE C1F CC91�M�±,1VC�10�EliTT. The exact completian date is unknown. <br /> However, Contractor believes the work will be complete no Iater than 6Q9 a�ay� from the effective <br /> date of the Agreement. <br /> 5. �'�VNE�ZS��'lAIJ'�`JE�0�21['�'X. (Jwner represents and war.rants that it has tlie <br /> authorify to enter into this Agreement. <br /> In tl�:e event the scope af work includes wark on a condominium, Owner acknowledges <br /> , that in order to perform the Work tl�at it may be necessary far Contractor to imprave the progerty , <br /> owned by the unit owners of the buildings lacated on the Property. (Jwner represents that it has <br /> the consent of the un�t owners to perfoxm all work necessary to complete the Project. Qwner agrees <br /> that thzs Agreement includes aII Work performed on the Properiy including,without limitation,all <br /> , Work to be perforrned on the unit owners'property. Owner agrees to pay Contractox�or all Work <br /> ', perfoz:med on the Praperty regardless of whether the Work was performed on property owned by <br /> ' the Owner-or the unit owners. Owner agrees to provide Contractor with access ta all units as <br /> needed. Owner has received aII req-�ired approvals from the unit owners ta enter into this <br /> Agreement. Ownex acknowledges that it is the agent for the unit ownexs and that it is the Owner <br /> PO Box 271450 Tampa FL 3368$-1450 <br /> � Office: $13-264-6262 <br /> �cEcmoNrc�so�.u�n�s CCC057428 CGC1523359 <br /> Owner Int.��.y"�Contr Int.�� <br /> Page�of 9 <br />