My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19293
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2018 7:30:35 AM
Creation date
9/24/2018 7:30:34 AM
Metadata
Fields
Template:
Building Department
Company Name
TC FIRST BAPTIST CHURCH OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
18-19293
Building Department - Name
TC FIRST BAPTIST CHURCH OF ZEPHYRHILLS
Address
38300 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the common elements of the property where the work is to be performed. Contractor is relying <br /> on the Owner's representations contained within this section of the Agreement. <br /> 6. CONTiLACT PRICE. Owner shall pay Contractor the following amount: <br /> $89,4$0.41. Owner shall pay or cause to be paid the amount of the payment request to Contractor <br /> within thirty(30)days of receipt of a payment request from Contractor. Beginning on the 315`day <br /> after Owner,'s receipt of a payment request, payments not timely made shall accrue interest on a <br /> daily basis at the rate of 1.5% g�er month,not to exceed the maximum amount of mterest allowed <br /> by law. Payments received shall be applied first to interest on all outstanding invoices and then to <br /> the principal amount of the oldest outstanding invoices. Contractor will not perform service, <br /> warranty andlor punch list work if Owner fails to timely pay Conh-actor,and Contractor may cease <br /> all work or terminate the Agreement if Owner fails to adhere to the payment schedule. By signing <br /> this Agreement, Owner gives Contractor the right to obtain a credit check on the s�gnatory. <br /> The construction industry is currently experiencing price and availability volatility with <br /> regard to the materials used for this Project. Because of market fluctuations, the prices of these <br /> materials are subject to sudden and significant changes and firm prices cannot be oUtained froin <br /> suppliers. Therefore, if there is an increase in the actual cost of the products charged to the <br /> Contractor in excess of five(5%)percent subsequent to making this Agreement,the price set forth <br /> in this Agreement shall be increased without the need-for a written change order or amendment to <br /> the Agreement to reflect the price increase and additional direct cost to the Contractor. Contractor <br /> will submit written documentation of the increased charges to the Owner upon request. As an <br /> additional remedy, if the actual cost of any material line item increases more than ten (10%) <br /> percent subsequent to the making of this Agreement, Contractor, at its sole discretion, may � <br /> terminate the Agreement for convenience. <br /> Should concealed or unknown conditions be at variance witl� conditions indicated in the <br /> description of the work to be performed from those ordinarily encountered and generally <br /> recognized as inherent in work of the character provided for in this Agreement, the Agreement <br /> price shall be equitably adjusted upon notice thereof from the Contractor to the Owner. <br /> 7. FIN�sNCING. This Agreement is not contingent on financing. <br /> 8. DESIGN�D COI�STRUCTION VARIA7['ION. <br /> (a) The design of the Project is dictated by the Owner or the Owner's Representative. <br /> Contractor is not responsible or liable for the design of the Project. <br /> (h) Owner acknowledges that in the course of construction,certain changes,�eviations <br /> or omissions in the design of the Project may occur or may result because of the <br /> � particular conditions of the job, lender requirements, �and/or governmental � <br /> authorities having jurisdiction over the Project. <br /> (c) In the event that materials to be used in the construction of the Project become <br /> unavailable, Contractor reserves the right to substitute substantially equivalent <br /> materials for the unavailable materials. <br /> (d) Based upon the foregoing, the Owner hereby authorizes the Contractor to <br /> underta�ce, without the need for specific authorization, any changes, deviations or <br /> omissions required by the particular conditions of the job, lender's requirements, <br /> PO Box 271450 Tampa FL 33688-1450 <br /> � Office: 813-264-6262 <br /> PAEC6i0{JROOFNGSOLLJT10N5 CCC057428 CGC1523359 <br /> Owner Int. '� Contr Int.��� <br /> Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.