Laserfiche WebLink
i , <br /> FLORIDA ENERGY EFFICIENCY C�ODE <br /> FOR BUILDING CONSTRUCTION <br /> Envelope Leakage Test Report <br /> Prescriptive and Performance Method - <br /> Project Name: Aria Elevation C Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City,State,Zip: Zephyrhills, FL, � Permit Number: <br /> Design Location: FL,Tampa Jurisdiction: <br /> Cond. Fioor Area:: 1672 sq.ft. Cond.Volume: 14496 cu ft. <br /> Envelope Leakage Test Results Leakage Characteristics <br /> Regression Data: <br /> C: n: R: <br /> CFM(50): <br /> Single or Multi Point Test Data - <br /> HOUSE PRESSURE FLOW: E�'' <br /> 1 Pa cfm EqLA: <br /> 2 Pa cfm ACH: <br /> 3 Pa cfm <br /> ACH(50): <br /> 4 Pa cfm <br />' S Pa cfm S�' <br /> 6 Pa cfm <br />� R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour - <br /> in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 <br /> inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party.A written report of the results of the <br /> test shall be signed by the party conducting the test and provided to the code official.Testing shall be pertormed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> During testing: , <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other <br /> infiltration controi measures; - <br /> 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration <br /> control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and - <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. - - <br /> 1 hereby certify that the above envelope leakage Where required by the code official, ��'���'x.qp� <br /> performance results demonstrate compliance testing shall be conducted by an �g�' ,,,h ,:�` b,fi <br /> with Florida Energy Code requirements in approved third party. A written �" '%�. ��,,�� . <br /> a c c o r d a n c e w i t h S e c t i o n R 4 0 2.4.1.2. r ep o rt o f t h e r e s u l t s o f t h e test shall �' 'r'+'f�''"�� ""`''°�':;�-�ti � <br /> _. be signed by the third party � _._��;;.�.�_~ -� Q. <br /> � conductin g the test and provided t o � �����; "� <br /> SIGNATURE: the code official. ' � <br /> � <br /> PRINTED NAME: ���b���� <br /> DATE: • <br /> BUILDING OFFICIAL: <br /> DATE: <br /> 1 0/30/2017 1 0:54 AM EnergyGauge�USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1 i <br />