Laserfiche WebLink
weldinginspection Ke on rcepvnff: yvuc-vuuulu <br /> Q �� p p Steel Reports 1-5 <br /> Report Date:11/16/2018 <br /> PROFESSIONAL I PRACTICAL I PROVEN <br /> Tampa /\) Client: Project: <br /> 4524 Oak Fair Boulevard <br /> Suite 200 ( Haskell 10106-1018007.000 <br /> Tampa,FL.33610, PO Box 45215(111 Riverside Avenue) Nestle Waters North America Zephyrhills <br /> Phone:813.623.3100 / � Jacksonville,FL 32232 Expansion <br /> Fax:-813.623.35.45 (�VJ 1 4330 20th St. <br /> l ` Zephyrhills,Florida 33542 <br /> Phase: Structural Steel Inspections <br /> Location: Building Exterior=Roof Contractor: R& D Erectors <br /> The following is a reference list of welding parameters related as required by Secion 3,5,9.6'of AWS D1.1. Yes/No <br /> Are contract documents.outlining specific job requirements in place?(6.1.2.1) Yes <br /> Are drawings provided showing size, length, type, and location of welds?(6.1.6) Yes <br /> Are weld and base material certifications available?(6:2) Not Applicable <br /> Are.qualified Welding Procedure Specifications in place?(6.3.1) Yes <br /> Are all,Welder Certification Records current and in place?(6.5.7) Yes <br /> Does welding equipment comply with requirements? (6.3.2) Yes <br /> Joint preparation and.fit-up was observed at suitable intervals. (6.5.4) Not Applicable <br /> Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes <br /> (5.30.1) <br /> Isveilding being performed under proper atmospheric conditions? (5.12.2) Yes <br /> Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable <br /> List of names of welders on project this date: reviewed on site <br /> Date: 07/.11/2018 Prepared by: Lafon, Barry <br /> No observations;tests, inspections or approvals by NOVA shall relieve the Contractor.from his obligation to,perform the Work in strict <br /> conformity with the-Contract Documents. NOVA's inspections and tests reported herein are in no way a guarantee of deficient-free' <br /> construction.The:information provided herein is intended-for the sole and exclusive use of our Client unless other written <br /> agreement is entered.into by NOVA,and other parties.All other recipients are provided this document and any corresponding tests <br /> and/or inspection results for information purposes only,and any use of said information shall be at their sole risk. <br /> Phase: Structural Steel Inspections <br /> Location: Building Exterior:Roof Contractor: R&D Erectors <br /> The following.is a reference list of welding parameters related as required by Secion 3,5,&6.of AWS W.I. Yes'/No <br /> Are contract documents outlining spec'ificjob requirements in place?(6.1.2.1) Yes <br /> Are drawings provided showing size, length, type, and location of welds?(6.1.6) Yes <br /> Are,weld and base material certifications available? (6.2) Not Applicable <br /> Are qualified Welding Procedure Specifications in place?(6.3.1) Yes <br /> Are all Welder Certification Records current and'in place?(6.5.7) Yes <br /> Does welding equipment comply with requirements? (6.3.2) Yes <br /> STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 1 of 6 <br />