Laserfiche WebLink
Weldin� Inspection Report Keporir;.:vvirc-uuuuiu <br /> N Q V� g p p steel Reportsl-5 <br /> Report Date: 11./16/2018 <br /> PROFESSIONAL I PRACTICAL I PROVEN <br /> Tampa Client: Project: <br /> 4524 Oak Fair Boulevard <br /> Suite 200 Haskell 10106=1018007.000 <br /> Tampa,FL 33610 PO Box 45275(111 Riverside Avenue) Nestle.Waters North America Zephyrhiiis <br /> Phone:813.623.3100 Jacksonville,FL 32232 Expansion <br /> Fax:813.623.3546 4330 20th St. <br /> Zephyrhilis,Florida:M4_2 <br /> The following Is a reference list of welding parameters related as required by Secion 3,5,&6 of AWS D1.1. Yes/No <br /> Joint preparation,and fit-up was observed at suitable intervals. (6.5.4) Not Applicable <br /> Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes <br /> (5.30.1). <br /> Is welding being performed under.proper atmospheric conditions?(5.12.2) Yes <br /> Is contractor in compliance,With pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable <br /> List of names of welders on project this date: reviewed on site <br /> Remarks: <br /> Arrived on site to observe.the placement of the roof deck and.attachments at line 5-6/AA-A and 475/A-A.5.The area was approved'. Nova <br /> reviewed erectors welder certifications and verified on site welders. <br /> Date: 07/13/2018 Prepared by: Lafon, Barry <br /> No observations,tests; inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work in strict <br /> conformity with the Contract Documents: NOVA's inspections and/or tests reported herein are in no,way a guarantee of deficient-free <br /> construction.The information provided herein is intended for the sole and.exclusive use of our Client unless other written <br /> agreement is entered into by NOVA and other parties:All other recipients,are provided this document and any corresponding tests <br /> and/or inspection results for information-purposes only,and any use of said information shall beat their sole risk. <br /> Phase:,Structural Steel Inspections <br /> Location: Building Exterior-Roof Contractor: R& D Erectors <br /> The following is.a reference list of welding.parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes/.No <br /> Are contract docunients.outlining specific job requirements.in place?(6.1.2.1.) Yes <br /> Are drawings provided showing size, length,type, and location of welds?(6.1.6) Yes <br /> Are weld and base material certifications available?(6.2) Not Applicable <br /> Are qualified Welding Procedure Specifications in place?(6.3.1) Yes <br /> Are all.Welder Certification Records current and in place?(6.5.7) Yes <br /> Does welding equipment comply with requirements?(6,3.2) Yes <br /> Joint preparation and fit-up was,observed at suitable intervals. (6.5.4) Not Applicable <br /> Are surfaces on which welding is to be performed, free of foreign material (scale,rust; moisture, grease)?(5:15) Yes <br /> . (5.30.1) .. <br /> I <br /> Is welding being performed under proper atmospheric conditions? (5.12.2) Yes <br /> Is.contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable <br /> List of names of welders on project this date: on site <br /> STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 2 of 6 <br />