Report#!WIR-000010Weldin Inspection Report steel Reports 1-5N � VA , <br /> Report Date:11.11612018 <br /> PROFESSIONAL I PRACTICAL I PROVEN <br /> Tampa. Client: Project: <br /> 4524 Oak Fair Boulevard <br /> Suite 200 Haskell 10106=1018007.000 <br /> Tampa,FL 33616 PO Box 45275(111 Riverside Avenue) Nestle Waters North America Zephyrhills <br /> Phone:.813.623.3100 Jacksonville,FL 32232 Expansion <br /> Fax:813.623.3545 4330 20th St. <br /> Zephyrhills,Florida 33542 <br /> Images Comments <br /> Arrived on site to observe the placement of the roof deck and <br /> attachments at line 3-4/A-A.5,the.work was incomplete at time of <br /> observation,and work is in progress by erector:;Reviewed <br /> erectors welder-certifications and verified on.site welders. <br /> RESOLVED <br /> DISCREPANCIES <br /> 1) Add joist x=bridging at line 5-6/A.5.Approved <br /> UNRESOLVED DISCREPANCIES <br /> 1) Install joist bridging and attach to panel at line A-A.5/3-4 <br /> 2) Install correct size bolts and tighten at line 4/A.5 <br /> 3 Install.stiffener at-8x8 joist seat per RFI at line 3/A-A.5. . <br /> 4) Install tilt=up panel to panel connection per C1/S-531 and <br /> 63/S-531 <br /> 5) Attach bridging to existing bar joist after the temporary wall <br /> is removed <br /> Observer noted that the existing girder bolted connections were <br /> very loose. Girders were not welded to the column top.The <br /> Contractor was informed onsite. <br /> Phase: Structural Steel Inspections <br /> Location: Building Exterior-'Roof Contractor: R&D Erectors <br /> The following is a reference list of Welding parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes No <br /> Are contract documents out specific job requirements in place?(6.1.2.1) Yes. . <br /> Are drawings,provided showing size,,length, type, and location of welds?(6.1..6) Yes <br /> Are weld and base material certifications available? (6.2) Not Applicable <br /> Are qualified Welding Procedure.Specifications in place?(6.3.1) Yes <br /> Are all Welder Certification Records current and in place?(65.7j Yes <br /> Does welding equipment comply with requirements? (6.3.2) - Yes <br /> Joint preparation and fit=up was observed at suitable intervals,.(6.5,4) Not Applicable, <br /> Are surfaces on which welding is to be performed, free of foreign material-(scale, rust, moisture, g(ease)?(5.15) Yes <br /> Is welding being_performed under_proper atmospheric conditions?(5.12.2) Yes <br /> Is.contractor in compliance with.pre-heat and/or post-heat requirement?(Table 3.2) Not'Applicable <br /> Date: 07/19/2018 <br /> Prepared by: Lafon;Barry <br /> I <br /> No observations,.tests, inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the-Work in strict <br /> conformity with the Contract Documents. NOVA'6 inspections and/or tests reported herein are in noway a guarantee.of deficient-free <br /> construction.The information provided herein is intended for the sole and exclusive use of our Client unless-other written <br /> agreement is entered into by NOVA and other,parties.All other recipients are provided this document and any corresponding tests <br /> and/or inspection results for information purposes only,and any use'of said information shall be at their sole risk. <br /> STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page:4 of 6 <br />