Laserfiche WebLink
WeldingInspection Report Report#'WIR-000010 <br /> p on steel Reports 1:-5 <br /> N o Y`,A Report Date: 11/16/2018 <br /> PROFESSIONAL I PRACTICAL I PROVEN <br /> Tampa . Client: Project: <br /> 4524 Oak Fair Boulevard <br /> Suite 200 Haskell 10106=1018007.000 <br /> Tampa,FL 33610, PO Box 45275(111 Riverside Avenue) Nestle Waters North America Zephyrhills <br /> Phone:813.623:3100 Jacksonville,FL 32232 Expansion <br /> Fax:813.623.3545 4330 20th St. <br /> Zephyrhills,Florida 33542 <br /> Images. Comments <br /> Arrived on site to observe the placement of the roof deck and <br /> attachments at line 3-4/A-A.5. See discrepancies below. <br /> Reviewed erectors welder certifications and verified on site . <br /> welders. RESOLVED DISCREPANCIES <br /> 1) Install joist bridging and attach to panel at line A=A.5/3-4. <br /> See report dated 7.17:18 <br /> 2) Install correct size bolts and tighten at line 4/A.5: See report <br /> dated 7.17...18 . <br /> 3) Install stiffener at 8z8 joist seat per RFI at line 3/A-A.5._See <br /> report dated 7.17.18 <br /> 4) Install tilt-up.panel to panel connection per.C1/S-531 and <br /> B3/S-531..See,report dated 7.17,18 UNRESOLVED <br /> DISCREPANCIES <br /> 1) Attach bridging to.existing bar joist after the temporary wall <br /> is removed. <br /> 2) Reference to Engineer sketch for repair at line A/3, detail. <br /> show 87 3/4"'anchors; in.the field there are 6. SEOR(Structural <br /> Engineer of Record),needs to verify if this is.acceptable._Also,the <br /> same detail shows a 5x3 angle bolted to the beam web and <br /> welded to the embed. Please verify if this is'required. <br /> 3) Reference to'Engineering sketch for the joist bearing seats <br /> at line 3/A-A.5..SEOR needs to verify-the size of the HIT=Z.anchor <br /> that is required. <br /> Phase:'Structu ra I Steel Inspections <br /> Location: Building Exterior_Roof Contractor: R&D Erectors <br /> The following:is a reference list of welding parameters related as required by Secion 3,5,&6 of AWS D1.1. Yes/No <br /> Are contractdocuments outlining.specificjob requirements.in place?(6,1.2,1.) Yes <br /> Are drawings provided showing size, length, type,and location of welds?(6.1.6) Yes <br /> Aremeld and base material certifications available? (6.2) Not_Applicable <br /> Are qualified.Welding Procedure Specifications iri place?(6.3.1) . Yes . <br /> Are all Welder Certification Records current and in place?(6.5.7) Yes <br /> Does welding equipment comply.with requirements?(6.3.2) Yes" <br /> Joint preparation and fit=up was.observed at suitable intervals. (6.5.4) Not Applicable <br /> A[e surfaces on which welding is to be performed, free of foreign material (scale, rust_, moisture, grease)?(5.15) Yes <br /> (5.30:1). <br /> Is'welding being performed under proper atmospheric conditions? (5.12.2) Yes <br /> i <br /> Is contractor in compliarice with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable <br /> i <br /> List of names of welders on project this date: on site <br /> Remarks: <br /> STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 5 of 6 <br /> I <br /> i <br />