My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19536
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 10:35:00 AM
Creation date
1/31/2019 10:34:57 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Building Department - Doc Type
Permit
Permit #
18-19536
Building Department - Name
KUPCZYK,RAYMOND & PAMELA
Address
37128 CULLEN TRL LOT 77
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br /> Limits of Use Certification Agency Certificate <br /> Approved for use in HVHZ:Yes FL4904 R8 C CAC NI006110.01.pdf <br /> Approved for use outside HVHZ:Yes Quality Assurance Contract Expiration Date <br /> Impact Resistant:Yes 12/31/2020 <br /> Design Pressure:+76.0/-76.0 Installation Instructions <br /> Other:Evaluated for use in locations adhering to the Florida Building FL4904 R8 II FL0128.pdf <br /> Code including the High Velocity Hurricane Zone,and where pressure Verified By:National Accreditation&Management Institute <br /> requirements as determined by ASCE 7,Minimum Design Loads for Created by Independent Third Party: <br /> Buildings and Other Structures,does not exceed the design pressures Evaluation Reports <br /> listed.T-0"x 6'-8"max nominal size.When large missile impact FL4904 R8 AE 514010A.pdf <br /> resistance is required,hurricane protective system is NOT required.See Created by Independent Third Party:Yes <br /> DWG-MA-FLO128-05 for details. <br /> 4904.2 Wood-edge Steel Side-Hinged Door Units 8'-0"Opaque I/S and O/S Single Door <br /> Limits of Use Certification Agency Certificate <br /> Approved for use in HVHZ:Yes FL4904 R8 C CAC N1006110.02.pdf <br /> Approved for use outside HVHZ:Yes Quality Assurance Contract Expiration Date <br /> Impact Resistant:Yes 12/31/2020 <br /> Design Pressure:+70.0/-70.0 Installation Instructions <br /> Other:Evaluated for use in locations adhering to the Florida Building FL4904 R8 II FL0129.pdf <br /> Code including the High Velocity Hurricane Zone,and where pressure Verified By:National Accreditation&Management Institute <br /> requirements as determined by ASCE 7,Minimum Design Loads for Created by Independent Third Party: <br /> Buildings and Other Structures,does not exceed the design pressures Evaluation Reports <br /> listed.3'-0"x 8'-0"max nominal size.When large missile impact FL4904_R8_A_E 514009A.p4f <br /> resistance is required,hurricane protective system is NOT required.See Created by Independent Third Party:Yes <br /> DWG-MA-FLO129-05 for details. <br /> 4904.3 Wood-edge Steel Side-Hinged Door Units 6-8"Opaque I/S and O/S Door w/or w/o Sidelites <br /> Limits of Use Certification Agency Certificate <br /> Approved for use in HVHZ:Yes FL4904 R8 C CAC NI006110.01.pdf <br /> Approved for use outside HVHZ:Yes Quality Assurance Contract Expiration Date <br /> Impact Resistant:Yes 12/31/2020 <br /> Design Pressure:+55.01-55.0 Installation Instructions <br /> Other:Evaluated for use in locations adhering to the Florida Building FL4904 R8 II FL0128.pdf <br /> Code including the High Velocity Hurricane Zone,and where pressure Verified By:National Accreditation&Management Institute <br /> requirements as determined by ASCE 7,Minimum Design Loads for Created by Independent Third Party: <br /> Buildings and Other Structures,does not exceed the design pressures Evaluation Reports <br /> listed.12'-0"x 6'-8"max nominal size.When large missile impact FL4904 R8 AE 514008A.pdf <br /> resistance is required,hurricane protective system is NOT required on Created by Independent Third Party:Yes <br /> opaque panels,but is required on glazed panels.See DWG-MA-FL0128- <br /> 05. <br /> 4904.4 Wood-edge Steel Side-Hinged Door Units 8'-0"Opaque I/S Door w/or w/o Sidelites <br /> Limits of Use Certification Agency Certificate <br /> Approved for use in HVHZ:Yes FL4904 R8 C CAC NI006110.02.pdf <br /> Approved for use outside HVHZ:Yes Quality Assurance Contract Expiration Date <br /> Impact Resistant:Yes 12/31/2020 <br /> Design Pressure:+45.0/-50.0 Installation Instructions <br /> Other:Evaluated for use in locations adhering to the Florida Building FL4904 R8 II FL0129.pdf <br /> Code including the High Velocity Hurricane Zone,and where pressure Verified By:National Accreditation&Management Institute <br /> requirements as determined by ASCE 7,Minimum Design Loads for Created by Independent Third Party: <br /> Buildings and Other Structures,does not exceed the design pressures Evaluation Reports <br /> listed. 12'-0"x 8'-0"max nominal size.When large missile impact FL4904 R8 AE 514007A.pdf <br /> resistance is required,hurricane protective system is NOT required on Created by Independent Third Party:Yes <br /> opaque panels,but is required on glazed panels.See DWG-MA-FL0129- <br /> 05. <br /> 4904.5 Wood-edge Steel Side-Hinged Door Units 8'-0"Opaque O/S w/or w/o Sidelites <br /> Limits of Use Certification Agency Certificate <br /> Approved for use in HVHZ:Yes FL4904 R8 C_CAC_N_I006110.002,pdf <br /> Approved for use outside HVHZ:Yes Quality Assurance Contract Expiration Date <br /> Impact Resistant:Yes 12/31/2020 <br /> Design Pressure:+50.0/45.0 Installation Instructions <br /> Other:Evaluated for use in locations adhering to the Florida Building FL4904 R8 II FL0129,1)df <br /> Code including the High Velocity Hurricane Zone,and where pressure Verified By:National Accreditation&Management Institute <br /> requirements as determined by ASCE 7,Minimum Design Loads for Created by Independent Third Party: <br /> Buildings and Other Structures,does not exceed the design pressures Evaluation Reports <br /> listed. 12'-0"x 8'-0"-max nominal size.When large missile impact FL4904 R8 AE 514007A.pdf <br /> resistance is required,hurricane protective system is NOT required on Created by Independent Third Party:Yes <br /> opaque panels,but is required on glazed panels.See DWG-MA-FL0129- <br /> 05. <br /> http://www.floridabuilding.org/pr/pr_app_dti.aspx?param=wGEVXQwtDgtelulwHNbbISci... 3/7/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.