My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19658
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 11:52:33 AM
Creation date
2/27/2019 11:51:58 AM
Metadata
Fields
Template:
Building Department
Company Name
CRESTVIEW HILLS
Building Department - Doc Type
Permit
Permit #
18-19658
Building Department - Name
RAKOCY,FRANKLIN & PLUMMER SHANNON
Address
7553 WEEHAWKEN DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROCK-IT sJSTem 4.0 inSTaLL <br /> c - <br /> rp �1 <br /> t <br /> 9 1 <br /> l <br /> d <br /> 4 <br /> Y 1 <br /> Pop <br /> f <br /> Fig.A <br /> Install EcoFasten Solar Flashing with,Rock-it Mounts <br /> •Fo1IowEao%stenSolarlmt3111nstructlonsforflasldng and bracketinstall(Gi6enFadenshownabove). <br /> •Optimum verticald(stancebdweenlag bob IsI3 rplusmoduledimeriskm <br /> •Setmorntsoneavemostrowsothaf the lodctPedesWisoniheSm.MendofRock4tsUde <br /> •Set mounts on all upper rows sothattheRodkltPedestalison the North e,ndofRock-it Slide- <br /> 2 Install Rock It Array Skirt onto Eave Mounts <br /> Slide Rock-it Array Skirt into front'channel on Rock-It Shelf. <br /> • Array Skirt End Caps are pre-installed on the East end of each skirt section,and are used to couple the skirt sections where needed(see Fig.A). <br /> Tighten Mid-Clamp bolt;clamping Rack-lt Array Skirt to mount.Torque to 200 in-lbs.(130In-firs.when instaiitng with 32mm modules). <br /> 3-4 Install Rock-It CouPlings(when joining 4 panels with a Coupling,the use of a load bearingioot Is required) <br /> • Prior to mounting on the'roof,snap Load Bearing Foot Imo the bottom of Rock It Coupling if required: <br /> (Each Load Bearing Foot is set to same height as the Rack-It Mounts-adjust accordingly) <br /> •On eave row only,slide Rock-It Array Skirt onto Rock-It Coupling Shelf.Torque to specified value <br /> • NOTE:If a coupling lands on a rafter,the Hybrid Mount'should be used in place of the Rock-it Coupling(refer to Image 3a). <br /> -Hybrid Mount can be made In the field by assembling a coupling to a mount pedestal,or by purchasing separately. <br /> iJ Align and Straighten First ROW of the Rock-it System With Rock-It Array Skirt. <br /> •use North-South adjustment of the Rock-ItPedesW.tostraightenRocklt Array Skirt and align module with Array Skim <br /> Torque screw on side of Rod-It Pedestal to 150 in-lbs to secure ittothe Rock4tSlide <br /> •Adjust Flange Level Nut to level the system(optional-can be leveled during orafter Installation). <br /> 6_9 Install 1st Row of PV Modules <br /> 56de upsiope Rock-It Mounts down to engage top of first module. <br /> •InstallRo*4 Couplingson the upslope side oflstrowofpanels. <br /> •Torque 2nd rowof Mid-Clamps on Rock4tMounts and Rode-ItCouplings to specified value. <br /> •Install balance of PV modules,eniuring that the Ro&-It Pedestals are In the appropriate po5ition,then torque Mid-Ciampi to secure modules. <br /> 10 Level the Rock-It System <br /> When assembly is complete,level the entire system by adjusting Flange Level Nuts(Flange Level Nuts have no torque value). <br /> • Height between roof surface and underside of modules should be 3'or less,when Installed with Type 2 modules. <br /> INSTALLATION NOTE:Modules should be installed so that the Junction box Is Installed upslope,away from the leading edge of the array, <br /> ummecofastensolar.com info@ecofastensolarcom 877-859-3947 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.