My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19658
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 11:52:33 AM
Creation date
2/27/2019 11:51:58 AM
Metadata
Fields
Template:
Building Department
Company Name
CRESTVIEW HILLS
Building Department - Doc Type
Permit
Permit #
18-19658
Building Department - Name
RAKOCY,FRANKLIN & PLUMMER SHANNON
Address
7553 WEEHAWKEN DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GrounDlnG LUG insTaLL <br /> •r, i <br /> i <br /> Necessary Components: <br /> One of the following ground lugs(or.any UL 2763 compliant ground lug): <br /> Burndy CL50-1TN Ground Lug(UL 2703-E351343 / UL 467-E9999) <br /> ILSCO SGB-4 Ground Lug(UL 2703-E354420 /UL 467-E34440) <br /> ILSCO GBL-4DBT(UL 2703-E354420 /UL 467-E34440) <br /> ILSCO GBL-4DBTH(UL 2703-E354420 /UL 467-E34440) <br /> ILSCO GBL-4SS(UL 2703.-E354420 /UL 467-E34440) <br /> Note:Drill and deburr hole in.Ground Lug prior to installation <br /> 14 AWG-4 AWG Copper Ground Wire* Torque Values: <br /> - 8-32 x 0.5"Serrated Flange Head Bolt(300 Series SS) 14-10 AWG=20 in-Ibs. <br /> - 8-32 Serrated Flange Nut(300 Series SS) 8 AWG=25 in-Ibs. <br /> - 11/32"and 1/4"wrenches or ratchets/sockets 6-4 AWG=35 in-Ibs. <br /> 1 Insert the flange bolt into the module ground hole.Place Star Washer over bolt.Place ground lug over the bolt and <br /> Star Washer,and turn to desired orientation. <br /> 2 Install Flange Nut. <br /> -3 Tighten Flange Nut/Bolt. <br /> 4 Place wire in Ground Lug channel and tighten set screw to complete assembly. <br /> *Wire should be sized in accordance with the National Electrical Code,NFPA 70,Section 690 45,and a minimum of <br /> 1/4"clearance required between bare copper wire and aluminum. <br /> Fes. <br /> Drill hole er roundin lu manufacturers <br /> P g 9 . 9 <br /> =` specifications in the ups lope part of Rock-It Coupling <br /> for attaching grounding lug. <br /> Note:Deburr hole in Ground Lug and Rock-it Coupling,prior to installation. <br /> www.ecofastensolar.com info@ecofastensolarcom 877=859-3947 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.