My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19658
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 11:52:33 AM
Creation date
2/27/2019 11:51:58 AM
Metadata
Fields
Template:
Building Department
Company Name
CRESTVIEW HILLS
Building Department - Doc Type
Permit
Permit #
18-19658
Building Department - Name
RAKOCY,FRANKLIN & PLUMMER SHANNON
Address
7553 WEEHAWKEN DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROC K-IT CLIP SS I Cl STa LL •Raptageh6rduug Location 5 <br /> I IL'AfROA Nm <br /> 1 Locate all parts <br /> -Locate the Rock-.It Clip.SS,micro-inverter/power optimizer,and the section of the module frame in which <br /> YOU will be mounting the micro-inverter/power optimizer. <br /> See fig.A for acceptable mounting locations. <br /> 2 Install the Rock-it Clip SS <br /> • Slide the Rock-it Clip SS onto the lip of the module frame. <br /> • Slide the micro-inverter/power optimizer into the opposite lip of the Rock-It Clip SS. <br /> • Tighten the bolt'to 150 in-lb minumum to clamp the Rock-It Clip SS to the module frame and the <br /> micro-inverter/power optimizer to the Rock-It Clip SS. <br /> • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is <br /> tight against the clip flange to avoid rotation during tightening. <br /> ROCK-IT CLIP 2.0 rST aLL <br /> Inverter Flange <br /> Module Frame <br /> Rock-it-Clip 2.0 <br /> 1 Locate all parts <br /> -Locate the Rock-It Clip 2.0,micro-inverter/power optimizer,and the section of the module frame in which you <br /> will be mounting the micro-inverter/power optimizer. <br /> 2.Install the Rock-It Clip 2.0(See below detail) <br /> • Slide the Rock-it Clip 2.0 onto the lip of the micro-inverter/power optimiser. <br /> • Slide the micro-inverter/power optimizer into the opposite lip of the module frame. <br /> • Tighten the bolt to 150 In-lb to clamp the Rock-it Clip 2.6 to the module frame and the micro-inverter/power <br /> optimizer to the Rock-wit Clip 2.0. <br /> • Ensure that the lip on the clip is tight against the frame and that the micro-inverter/power optimizer flange is <br /> tight against the clip flange to avoid rotation during tightening. <br /> www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.