My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20232
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:03:05 AM
Creation date
3/4/2019 11:03:04 AM
Metadata
Fields
Template:
Building Department
Company Name
SOUTH PASCO HEALTH CARE PROPERTIES
Building Department - Doc Type
Permit
Permit #
18-20232
Building Department - Name
SOUTH PASCO HEALTH CARE PROPERTIES
Address
38250 A AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAIKIN <br /> Scope of Work <br /> • Secure existing Chiller at Sundown <br /> • Receive and unload new Daikin AGZ7070 Stock Chiller <br /> • LOTO Existing Chiller and Pumps <br /> • Disconnect existing chiller and load on customer's truck, <br /> • Set new chiller on existing concrete pad <br /> • connect to existing electric <br /> • pipe new chiller in 3"sched 80 PVC <br /> • provide provisions for future for temporary chiller hook up <br /> • provide and install new strainer at inlet of evaporator <br /> • start-up and log unit <br /> • All work is to be preformed afterhours <br /> • All Piping is to be prefabricated prior to Project Start <br /> • Secure permit <br /> • OPTION 1...Price add for.Extended 4 Yr Total Unit Parts and'Labor including 5 Year <br /> Refrigerant....$5,920.00 Plus applicable taxes <br /> Each of our sub-contractors will be maintaining a consistent project manager who will be represented <br /> when appropriate during our project time frame. <br /> Staff and resource planning will be maintained throughout the project through our project <br /> communication efforts. <br /> Proposal Clarifications, Exclusions, and Exceptions: <br /> Clarifications: <br /> 1. This proposal takes precedence over any other written,verbal,or other statements of scope, <br /> schedule,and pricing. <br /> 2. Acceptance of,a Notice to Proceed is not an acceptance of terms and conditions.Any Notice to <br /> Proceed will be based upon the terms and conditions contained in this proposal. <br /> 3. All working hours are estimated at regular or straight time rates.Accelerated or expedited project <br /> execution schedules and associated costs are subject to additional quotation, <br /> 4. Daikin Applied is not responsible for any delays or cost as a result of delays incurred due to limited, <br /> or no access to roads, buildings or equipment required to complete the scope of work provided <br /> for in this proposal. <br /> 5. Sales takes are not included within our pricing. <br /> 6. Costs associated with Owner directed programs or software required to fulfill project reporting, <br /> execution,safety management,and or Owner or Owner's Representative invoicing are not <br /> covered and will be invoiced in addition to the agreed proposal price. <br /> 7. Signage will not be provided or installed by Daikin Applied. <br /> 8. Staffing of onsite Safety or Security personnel during project execution or after working hours will <br /> not be provided and Daikin Applied understand this is the responsibility of the Owner or Owner's <br /> Representative. <br /> 9. Site drainage, pollution prevention plan and execution,temporary bathrooms,emergency eye- <br /> wash stations, barricades,ramps,splash-blocks,fire protection plans and systems required during <br /> ©2018 Daikin Applied Page 12 Project Proposal <br /> Proposal#:Q-00019284 <br /> Michael Opal <br />
The URL can be used to link to this page
Your browser does not support the video tag.