My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20232
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:03:05 AM
Creation date
3/4/2019 11:03:04 AM
Metadata
Fields
Template:
Building Department
Company Name
SOUTH PASCO HEALTH CARE PROPERTIES
Building Department - Doc Type
Permit
Permit #
18-20232
Building Department - Name
SOUTH PASCO HEALTH CARE PROPERTIES
Address
38250 A AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction,flagman,access controls features,trash repositories and pick services are not <br /> included. Daikin Applied understands the Owner or Owners Representative is responsible for <br /> these measures. <br /> 10. Daikin Applied understands temporary HVAC,temporary power,work site lighting,and temporary <br /> water required to perform the.scope of work provided is the Owner or Owner's Representative <br /> responsibility. <br /> 11. Daikin Applied will only provide supervision for itself and its sub-contractors when we or they are <br /> on site. <br /> 12. Daikin Applied Material or Labor warranty is excluded on Owner or Owner's Representative <br /> provided equipment. <br /> Exclusions: <br /> 1. Any labor, materials,or subcontracted service not specifically provided for in the description or <br /> scope of work. <br /> 2. Identification and remediation of existing code violations: <br /> 3. Authority Having Jurisdiction required changes are not included and will be quoted as additional <br /> work scope. <br /> 4. Painting, repair work to buildings,and/or equipment which is not specifically identified in the <br /> description or scope of work. <br /> 5. Costs associated with hazardous materials identification, removal, and/or abatement. <br /> 6. Temporary or portable HVAC equipment and connections to existing systems. <br /> 7. The creation of new Building Automation Systems graphics, monitoring,trending,analysis or any <br /> other software or labor required for implementation of these items. <br /> 8. Testing and balancing. <br /> 9. Commissioning plan development and execution. <br /> 10. Sound testing or acoustical treatments for any elements inside or external to the work site or <br /> equipment. <br /> 11. Seismic analysis and certification for all materials and equipment. <br /> 12. Permits, insurance coverages other than indicated in the attached Evidence of Insurance,and <br /> performance and payment bonds. <br /> 13. Professional services including Architectural,Mechanical, Electrical,Structural and other <br /> Engineering Disciplines. <br /> 14. Fire,Smoke and/or Security controls;equipment, repair,graphics, programming, replacement or <br /> upgrades. <br /> ©2018 Daikin Applied Page 13 Project Proposal <br /> Proposal#:Q-00019284 <br /> Michael Opal <br />
The URL can be used to link to this page
Your browser does not support the video tag.