Laserfiche WebLink
u TRINITY ER® <br /> APPENDIX 1:ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE <br /> Table Deck Application Type Description Page <br /> 1A Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 6-8 <br /> 113 Wood New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 9-10 <br /> 1B Wood New,Reroof(Tear-Off)or Recover B-1 Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover it <br /> 1C Wood New,Reroof(Tear-Off)or Recover C-1 Mechanically Attached Insulation,Bonded Roof Cover 11-12 <br /> 1D Wood New,Reroof(Tear-Off)or Recover C-2 Plate-Bonded Roof Cover 13 <br /> 1E Wood New,Reroof(Tear-Off)or Recover D-1 Insulated,Mechanically Attached Roof Cover 14 <br /> 1F Wood New,Reroof(Tear-Off)or Recover D-2 Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 14 <br /> 1G Wood New,Reroof(Tear-Off)or Recover E-2 Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 15-17 <br /> 2A Steel New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 18 <br /> 2B Steel orStructural concrete New,Reroof(Tear-Off)or Recover B-1 Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 18-22 <br /> 2C Steel or Structural concrete New,Reroof(Tear-Off)or Recover B-1 Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Base and Cap Ply 23 <br /> 2D Steel or Structural concrete 'New,Reroof(Tear-Off)or Recover B-2 Mech.Attached Thermal Barrier,Bonded Temp Roof,Bonded Insulation,Bonded Roof Cover 24-25 <br /> 2E Steel or Structural concrete New,Reroof(Tear-Off)or Recover C-1 Mechanically Attached Insulation,Bonded Roof Cover 26-33 <br /> 2F Steel or Structural concrete New,Reroof(Tear-Off)or Recover C-1 Mechanically Attached Insulation,Bonded Base and Cap Ply 34 <br /> 2G ... Steel or'Structural concrete New,Reroof(Tear-Off)or Recover C-1A Thermal Barrier with Vapor Barrier,Mechanically Attached Insulation,Bonded Roof Cover 35-39 <br /> 2H Steel or Structural concrete _ New,Reroof(Tear-Off)or Recover C-2 Mechanically Attached Insulation,Plate-Bonded Roof Cover 40-41 <br /> 21 Steel or Structural concrete New,Reroof(Tear-Off)or Recover D-1 Insulated,Mechanically Attached Roof Cover 42-43 <br /> 21 Steel or Structural concrete New,Reroof(Tear-Off)or Recover D-2 Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover . 43 <br /> 3A Structural concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 44-52 <br /> 3B Structural concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Base and Cap Ply 53 <br /> 3B Structural concrete New,Reroof(Tear-Off)or Recover F Non-Insulated,Bonded Roof Cover 53 <br /> 4A LWIC New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 54-55, <br /> 4B LWIC New or Reroof(Tear-Off) A-2 _ Mechanically Attached Anchor Sheet,Bonded insulation,Bonded Roof Cover 56 <br /> 4C -LWIC New,Reroof(Tear-Off)or Recover C-2 Plate-Bonded Roof Cover 57 <br /> 4D LWIC New,Reroof(Tear-Off)or Recover D-1 Insulated;Mechanically Attached Roof Cover 57-58 <br /> 4E LWIC New or Reroof(Tear Off) E Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 58-59 <br /> 4F LWIC New or Reroof(Tear Off) - F Non-Insulated,Bonded Roof Cover 59-60 <br /> SA CWF New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 61 <br /> 5B CWF New;Reroof(Tear-Off)or Recover C-1 Mechanically Attached Insulation,Bonded Roof Cover 62 <br /> 5C CWF New,Reroof(Tear-Off)or Recover E-2 Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 62 <br /> 6A Gypsum Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 63-64 <br /> 6B Gypsum Reroof(Tear-Off) A-2 Mechanically Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 64 <br /> 6C Gypsum Reroof(Tear-Off) B-1 Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 65-67 <br /> 6D Gypsum Reroof(Tear-oft) C-1 Mechanically Attached Insulation,Bonded Roof Cover 67-69 <br /> 6E Gypsum Reroof(Tear-Off) E-2 Non-Insulated,Mechanically Attached.Base Sheet,Bonded Roof Cover 68 <br /> 6F Gypsum Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 68 <br /> 7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 69-82 <br /> 7B ' Wood or Steel Recover C-2 Plate-Bonded Roof Cover 83 <br /> 7C Steel Recover D-1 Insulated,Mechanically Attached Roof Cover 84 <br /> 7D Various Recover F Non-Insulated,Bonded Roof Cover 84 <br /> Exterior Research and Design,LLC.d/b/a Trinity I ERD Evaluation Report 01506.12.13-1-R15 for FL16730-1114 <br /> Certificate of Authorization#9503 6'EDITION(2017)FBC HVHZ EVALUATION Revision 1S:10/17/2017 <br /> Prepared by: Robert Nieminen,PE-59166 EverGuard TPO Single-Ply Roof Membrane Systems,(800)766-3411 Appendix 1,Page 1 of 84 <br />