._, TRINITY1ER®
<br /> The following notes apply to the systems outlined herein:
<br /> 1. The evaluation herein pertains to above-deck roof components;deck-attachment details pertain to'as-tested'conditions under Testing Application Standard TAS 114,Appendix J. Roof decks shall be in accordance
<br /> with FBC(HVHZ)requirements to the satisfaction of the Authority Having Jurisdiction.
<br /> 2. Unless otherwise noted,fasteners and stress plates for insulation or base sheet attachment shall be as follows. Fasteners shall be of sufficient length forthe following engagements:
<br /> ➢ Wood Deck: Drill-Tec#12 Fastener or Drill-Tec#14 Fastener with Drill-Tec 3"Standard Steel Plate,Drill-Tec 3"Steel Plate,Drill-Tec 3 in.Ribbed Galvalume Plate(Flat)or Drill-Tec AccuTrac Flat Bottom
<br /> Plate or Drill-Tec AccuTrac Recessed Plate(insulation only), Drill-Tec ASAP 3S or Drill-Tec Heavy Duty ASAP 3S. Min.0.75-inch plywood penetration or minimum 1-inch wood plank
<br /> embedment.
<br /> ➢ Steel Deck: Drill-Tec#12 Fastener,Drill-Tec#14 Fastener or Drill-Tec XHD Fastener with Drill-Tec 3"Standard Steel Plate,Drill-Tec 3"Steel Plate,Drill-Tec 3 in.Ribbed Galvalume Plate(Flat)or Drill-
<br /> Tec AccuTrac Flat Bottom Plate or Drill-Tec AccuTrac Recessed Plate(insulation only). Minimum 0.75-inch steel penetration,engage the top flute of the steel deck.
<br /> ➢ Structural concrete: Drill-Tec#14 Fastener or DrilFTec CD-10 with Drill-Tec 3"Standard Steel Plate,Drill-Tec 3"Steel Plate,Drill-Tec 3 in.Ribbed Galvalume Plate(Flat)or Drill-Tec AccuTrac Flat Bottom Plate
<br /> or Drill-Tec AccuTrac Recessed Plate(insulation only) or Drill-Tec Heavy Duty ASAP 3S.Minimum 1.25-inch embedment. Fasteners installed with a pilot hole in accordance with the
<br /> fastener manufacturer's published installation instructions.
<br /> 3. Unless otherwise noted, insulation may be any one layer or combination of polyisocyanurate, polystyrene, wood.fiberboard, perlite, gypsum-based roof board or mineral wool roof board that meets the QA
<br /> requirements of F.A.C.Rule 61G20-3 and is documented as meeting FBC(HVHZ)1516 and,forfoam plastic,FBC Chapter 26,when installed with the roof cover.
<br /> Referto GAF published installation instructions for details and requirements regardingthe use of FBC HVHZ approved polystyrene insulation in EverGuard®roofing systems:
<br /> Insulation:, High Traffic Applications: Recover Applications:
<br /> ➢ .FBC HVHZ approved Expanded polystyrene (EPS) meeting or ➢ FBC HVHZ approved Extruded-polystyrene (XPS) meeting or ➢ FBC.HVHZ approved XPS Fan-Fold Recover Board with plastic
<br /> exceeding Testing Application Standard TAS 110 and ASTM C578, exceeding Testing Application Standard TAS 110,and ASTM C578, facet meeting or exceeding Testing Application Standard TAS 110
<br /> Type IX, nominal 1.8 Ib/ft2 density and minimum 25, psi Type IV,minimum 1-inch thick and minimum 25 psi compressive and ASTM C578, Type IV, 3/8-inch thick and minimum 25 psi
<br /> compressive strength. strength. compressive strength.
<br /> ➢ FBC HVHZ approved Expanded polystyrene (EPS) with plastic ➢ FBC HVHZ approved Expanded polystyrene (EPS) with plastic ➢ FBC HVHZ approved EPS Recover Board meeting or exceeding
<br /> facer meeting or exceeding Testing Application Standard TAS 110 facer meeting or exceeding Testing Application Standard TAS 110 Testing Application Standard TAS 110 and ASTM C578,Type IX,
<br /> and ASTM C578, Type IX, nominal 1.8 Ib/ft2 density and and ASTM C578,Type IX,minimum 1-inch thick and minimum 25 1/2-inch thick and minimum 25 psi compressive strength.
<br /> minimum 25 psi compressive strength. psi compressive strength. ➢ FBC HVHZ approved EPS-Recover Board with plastic facer
<br /> meeting or exceeding Testing Application Standard TAS 110 and
<br /> _ ASTM C578, Type IX, 1/2-inch thick and minimum 25 psi
<br /> --_ _ — -- —compressive strength:. - --
<br /> TOPCOAT°FireOut—Fire Barrier Coating,VersaShield®Fire-Resistant Roof Deck Protection or VersaShield®Solo'"Fire-Resistant Slip Sheet,installed in accordance with GAF published installation instructions and fire
<br /> resistance certification listings,may be used as a non-load=bearing,fire-barrier/slip-sheet component within any system outlined herein.
<br /> 4. If mechanical attachment to the structural deck through lightweight insulating concrete is proposed,field withdrawal resistance testing shall be performed to confirm equivalent or determine enhanced fastening
<br /> patterns and density. All testing and fastening design shall be in compliance with Testing Application Standard TAS 105 and Roofing Application Standard RAS 117 and/or RAS 137. Calculations shall be prepared,
<br /> signed and sealed by a qualified design professional.
<br /> 5. Preliminary insulation attachment for System Type C-2 and D=Minimum four fasteners per 4 x 8 ft board or minimum two fasteners per 4 x 4 ft board. ._
<br /> 6. Unless otherwise noted,insulation adhesive application rates areas follows. Ribbon or bead width is at the time of application;the ribbons/beads shall expand as noted in the manufacturer's published instructions.
<br /> ➢ Hot Asphalt(HA): Full mopping,25-30lbs/square.
<br /> ➢ GAF 2-Part Roofing Adhesive(GAF 2-Part): Continuous 25 to 35-inch ribbons,12-inch o.c.
<br /> ➢ LRF Adhesive M(LRF-M): Continuous 0.75 to 1-inch wide ribbons,12-inch o.c.
<br /> ➢ OlyBond Adhesive Fastener(Classic): Full coverage,1 gal/square.
<br /> ➢ OlyBond 500(b6500): Continuous 0.75 to 1-inch wide ribbons,12-inch o.c.using PaceCart,SpotShot or Canister delivery methods. Note:Olyeond Classic orOlyeond 500 Green may be used
<br /> in place of OB5OO.
<br /> ➢ Note: When multiple layers(s)of insulation and/or coverboard are installed in ribbon-applied adhesive,board joints shall be staggered.
<br /> ➢ Note: The maximum edge distance from the adhesive ribbon to the edge of the insulation board shall be not less than one-half the specified ribbons spacing.
<br /> Exterior Research and Design,LLC.d/b/a Trinity IERD Evaluation Report 01506.12.13-1-R15 for FL16730-R14
<br /> Certificate of Authorization#9503 e'EDITION(2017)FBC HVHZ EVALUATION Revision 15:10/17/2017
<br /> Prepared by: Robert Nieminen,PE-59166 EverGuard TPO Single-Ply Roof Membrane Systems;(800)766-3411 Appendix 1,Page 2 of 84
<br />
|