Laserfiche WebLink
I <br /> 1 1 <br /> 2017 -AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> i <br /> TABLE 402.4.1.1 f <br /> AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> Project Name: Zook Builder Name: <br /> Street: Permit Office: Pasco <br /> City,State,Zip: FL, Permit Number: j <br /> Owner: Zook Residence Jurisdiction: I <br /> Design Location: FL,Tampa <br /> COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA <br /> General A continuous air barrier shall be installed in the building envelope. Air-permeable Insulatiion shall <br /> requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. <br /> Breaks or joints in the air barrier shall be sealed. <br /> Ceilinglattic The air barrier In any dropped ceilfngisofflt shall be aligned with the The insulation in any dropped ceiling/soffit <br /> Insulation and any gaps In the air barrier shall be sealed. shall be aligned with the air barrier. <br /> Access openings,drop down stairs or knee wall doors to <br /> unconditioned attic-spaces shall be seated. <br /> i <br /> Walls The junction of the foundation and sill plate shalt be seated. Cavities within corners and headers of frame wails <br /> The junction of the top plate and the tap of exterior walls shall be shall be insulated by completely filling the cavity with a <br /> sealed. material having a thermal resistance of R-3 per inch <br /> Knee walls shall be sealed. minimum. <br /> Exterior thermal envelope Insulation for framed walls <br /> shall be installed in substantial contact and continuous <br /> alignment with the air barrier. <br /> Windows,skylights The space between window/door jambs and framing,and <br /> and doors skylights and framing shall be sealed. <br /> Rim joists Rim joists shall include the air barrier. Rim joists shall be Insulated. i <br /> Floors The air barrier shall be Installed at any exposed edge of Floor framing cavity insulation shall be installed to <br /> (including insulation. maintain permanent contact with the underside of <br /> above-garage subfloor decking,or floor framing cavity insulation <br /> and cantilevered shall be permitted to be in contact with the top side <br /> floors) of sheathing,or continuous insulation installed on <br /> the underside of floor framing and extends from the <br /> bottom to,the top of all perimeter floor framing <br /> members. <br /> Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation <br /> a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls. <br /> Shafts,penetrations Duct shafts,utility penetrations,and flue shafts opening to <br /> exterior or unconditioned space shall be sealed. <br /> Batts in narrow cavities shall be cut to fit,or narrow <br /> Narrow cavities cavities shall be filled by insulation that on <br /> installation readily conforms to the available cavity <br /> spaces. <br /> Garage separation Air sealing shall be provided between the garage and conditioned spac is. IV <br /> Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures Installed In the building <br /> shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. <br /> Plumbing and wiring Batt Insulation shall be cut neatly to fit around wiring <br /> and plumbing In exterior walls,or Insulation that on <br /> installation readily conforms to available space shall <br /> extand behind piping and wiring. <br /> Shower/tub The air barrier Installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall <br /> on exterior wall, tubs shall separate them from the showers and tubs. be insulated. <br /> Electrical/phone box,or The air barrier shall be Installed behind electrical or communication <br /> exterior walls boxes or air-sealed boxes shall be installed. <br /> HVAC register boots HVAC register boots that penetrate building thermal envelope shall <br /> be sealed to the sub-floor.or drywall. i <br /> Concealed When required to be sealed,concealed fire sprinklers shall only be <br /> sprinklers sealed in a manner that Is recorrimended by the manufacturer. <br /> Caulking or other adhesive sealants shall not be used to fill voids i <br /> between fi <br /> a.In addition,inspection of log walls shall be in accordance with the ptovisions of 1CC-400. <br /> 115/201 8 1 1:57 AM EnergyGauge®USA-FlaRes2017 FBC 81h Edition(2017)Compliant Software Page 1 of 1 <br />