Laserfiche WebLink
! I <br /> • • , /fin s-��.^ <br /> Building and Constritction Services (BCS) <br /> ASC . ' <br /> COUNTY FLcJRI17A Blower Door Test Repo <br /> Pl.,fs(:T:S. <br /> ft Form <br /> Property Address: �Dq <br /> X lrjeh Wal/ow <br /> bc <br /> Unit#:S-0 <br /> Permit#: a dry, Testing Company Name: <br /> tPffl <br /> Test date: (4� Tester Name: /G b <br /> TesterCert#: 1 Contact Phone: <br /> Email: <br /> 402.4.1.2 Testing.Building envelope airtightness shall be demonstrated by Section 402.4.1.2 <br /> The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes <br /> per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).As required by <br /> the Building Official,testing shall be conducted by an approved third party.A written report of the results of the test <br /> shall be signed by the party conducting the test (including Agency Name)and provided to the Building Official prior <br /> to Certificate of Occupancy issuance. Testing shall be performed at any time after creation of all scheduled <br /> penetrations of the building thermal envelope. <br /> During testing:(check to verify condition met) <br /> ❑ Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended <br /> weather strippingor other <br /> ❑Dampers includingexhaust,intake,makeup air,backdraftand fluedampers shall beciosed,but not sealedbeyond <br /> intended infiltration <br /> ❑Interior doors,if installed atthetime of the test, shall beopen <br /> ❑ Exterior doors for continuous ventilation systems and heat recovery ventilators shall beclosed andsealed <br /> ❑Heating and coolingsystems,if installed atthe time of the test,shall beturned off <br /> ❑Supply a nd return registers,if installed atthe time of the test, shall beful ly open <br /> Vb Building volume (ft3) _ _t �N. <br /> Q50 Airflow at 50 Pascal(CFM) <br /> ACH50 Air changes per hour at 50 Pascal: <br /> Qsox 60=Vh = '�;. M ACH5o (3.0 ACHminimum) <br /> Pass- Fail ❑ <br /> ❑Outside Air mechanically introduced to space(less than 3.0 ACH) <br /> I hereby certify hat the above envelope leakage performance results demonstrate compliance <br /> h Florida ergy Coder uirements in accordance with Section 402.4.1.2. <br /> A. <br /> Signa of Tester D to <br />