My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20175
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:43:30 AM
Creation date
5/29/2019 6:40:05 AM
Metadata
Fields
Template:
Building Department
Company Name
OAK CREST ESTATES
Building Department - Doc Type
Permit
Permit #
18-20175
Building Department - Name
MILLER,CHARLES D & TAYLOR,CYNTHIA
Address
6823 OAKCREST WAY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SMA S137.7-US Inverter with Hyundai HIS-S290RG Modules <br /> 8.99 kW DC Photovoltaic System Electrical Diagram with (3) Series Strings 1-11, 2-10 <br /> 5 6 7 8 s <br /> Optional Supply Side Connection <br /> NEC 705.17A <br /> ToN-de' s2so- _ U--�Modules <br /> 1)Hyundai HiS-S290 in series <br /> L1 <br /> G N N M <br /> GEC re capper 3)06 1 UNai.mefer <br /> THHNRHWN-2 2ooA $290- <br /> 3l4"PVC condole .. #10 <br /> 60 A fused RG <br /> disconnect with - Hyundai HiS-S290RG 40A fu SMA SB7.7-US Inverter <br /> fuses existing Main Distribution <br /> grounding Panel Module Specifications <br /> Pmax:290 Wp Max.Input DC Voltage:600 VDC <br /> szso (10)Hyundai Max ISC per string: 18 A <br /> RG —� QQU*h <br /> HiS-S290RG VOC: 38.8 V <br /> 200A Panelboard with Vm 32.0 V MPPT Range: 100-550 VDC <br /> Modules in series pp' Max Output Voltage:240 VAC <br /> 200 A Main breaker Isc: 9.7 A <br /> O6)#10 AWG PV Wire 3-R,3-B (1)#6 AWG Bare Copper Impp: 9.1 A Max Output current: 32A(AC) <br /> 3 200A.2 .C.Voltage. -0.30/61C AC Nominal Power:7680 Watts <br /> O (6)#10 AWG THHN/THWN-2 Notes: All work to meet or exceed NEC 2011 <br /> OO 3-13,3-11 0Junction box to be located within the array boundary. Junction box must be minimum Nema 311 UL listed <br /> 10 (1)#8 AWG THHN/THWN-2 enclosure.Free air conductors must be installed in raceway if readily accessible as per 690.31(A). <br /> Nema 3R 1-G Orhe minimum volume of the Nema 311 enclosure for the transition of PV wire to THWN-2 wire shall be <br /> 11 Junction 3/4"EMT,FMC(inside structure 48 cubic inches. Heyco 5 wire Masthead gland seals or similar connector are required as strain relief <br /> 40Al2 <br /> Box LFNC,PVC(outside structure) for PV wire into Nema 311 junction box at array. <br /> jp��_i 690.31E Olnterconnection with 40 Amp 2 pole OCPD via 2011 NEC 705.12(D)(2)Load Side Connection. The 40 A <br /> i backfed breaker must be located at the opposite end of the bus from the 200 A main supply breaker <br /> SMA Sunny Boy 7.7-US a@The required PV Backfed breaker plus the main breaker rating must be less than or equal to 120%of <br /> i Dc Transformerless Inverter with the Main service bus rating. 705.12(D)(2) <br /> exrstery n 9 OOptional Supply Side connection via 705.12A using parallel line taps in a NEMA 3R box(as required) <br /> ground'mg 4 p� integrated DC disconnect <br /> electrode • <br /> (4)#8 AWG THHN/THWN- using NSI IPCS4002, Ilsco IPC-KUP-L or NSI Tork IPLD 310-3 Multi-Tap Connector or equivalent. <br /> i ss <br /> - PV service disconnecting means for"optional"supply side connection must have neutral/EGC bond <br /> 1B,1-R,1-W 1-G <br /> i within and must be listed as"suitable for use as service equipment." 230.66 <br /> 1 3/4"EMT,FMC,LFNC, <br /> OThe fuses in the disconnect for the"supply side"option must be rated to handle the maximum short- <br /> or PVC circuit current available at the supply terminals.110.9,110.10 Over-current protection for the supply side <br /> �••— -----•—• connected conductors shall be located within 10 feet of the connection to the service. 705.31 <br /> s0 Grounded conductor shall be routed with ungrounded conductors to PV Service disconnecting means as <br /> (4)#8 AWG THHN/THWN-2 per 250.24(C)if"Supply Side"option is used. <br /> 1-B,1-11,1-W,1-G sO For"Supply Side option" Continuous or irreversibly spliced Grounding Electrode Conductor installed <br /> 3/4"EMT,FMC,LFNC,or PVC per 250.24(D). Grounding Electrode Conductor shall be specified as per 260.64 and sized per 260.66 <br /> 8The following label is required on meter can and main panelboard"Services fed from dual power sources <br /> Utility and Photovoltaic system" <br /> ff required by Utility 71 "PV input Do not relocate this OCPD"label required adjacent to backfed breaker. 705.12(d)(7) <br /> 60A 240V AC Disconnect with label <br /> On-site Utility Generation 73 12 onding of module to rail and module to module accomplished through WEEB washers or self grounding <br /> Disconnect Switch DC Disconnect Label Requirements mid-clamps. <br /> Vmpp 352 vdc 13 "Warning:DC conductors of this system are ungrounded and may be energized"required on the <br /> MaxV459 vdc DC Disconnect 690.35E <br /> PV AC Disconnect Label Requirements 14."Warning:Photovoltaic Power Source"label required on conduit per 690.31(E)(3)(4) <br /> Operating Current:32 A Impp 27.3 A 15. Total voltage drop%for all circuits based on listed conductors is 1.640/6 <br /> Operating Voltage:240 VAC [max 36.37 A 1 16. Fuses are required on positve and negative conductors of systems with 3 or more strings(source circuits). <br />
The URL can be used to link to this page
Your browser does not support the video tag.