My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20407
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 7:24:26 AM
Creation date
6/4/2019 7:24:25 AM
Metadata
Fields
Template:
Building Department
Company Name
HIDDEN RIVER
Building Department - Doc Type
Permit
Permit #
18-20407
Building Department - Name
LENNAR HOMES LLC
Address
3052 MOULDEN HOLLOW DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1�kj-iidjng alld ('t)nstl'uctioll Services <br /> PANU <br /> COUNTY Fi-oRHIVA <br /> ES-lo-wev 00cm- 7est Report Form <br /> Property Address: #: <br /> ,3o,T2 IM&�,le-l-eit-) <br /> Permit#: Testing Company Name: SKYETEC <br /> Test Date, j <br /> 17 Tester Name: <br /> KIM SWEARINGEN <br /> Tester Cert 41. 920541 Contact Phone: 904 482 4260 <br /> r- Email: BHARRIS@SKYETEC.COM <br /> 402.4.1.2 Testing.Building envelope air tightness shall be demonstrated by Section 402.4.1.2 <br /> The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes <br /> per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals).As required by <br /> the Building Official, testing shall be conducted by an approved third party. A written report of the results of the test <br /> shall be signed by the party conducting the test(including Agency Name) and provided to the Building Official prior <br /> to Certificate of Occupancy issuance. Testing shall be performed at any time after creation of all scheduled <br /> penetrations of the building thermal envelope. <br /> During testing:(check to verify condition met) <br /> Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended <br /> weather-stripping or other I <br /> XDampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond <br /> intended infiltration <br /> Ointerior doors,if installed at the time of the test,shall be open <br /> Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed <br /> CKHeating and cooling systems,if installed at the time of the test,shall be turned off <br /> Upply and return registers,if installed at the time of the test,shall be fully open <br /> Vb Building volume(ft') <br /> Q5o Airflow at 50 Pascal(CFM) <br /> ACHM Air changes per hour at 50 Pascal <br /> Q50 x 60+Vb = ACH50 (3.0 A CH minimum) <br /> Pass Fail ❑ <br /> ❑Outside Air mechanically introduced to space(less than 3.0 ACH) <br /> I hereby certify that the above envelope leakage performance results demonstrate compliance <br /> iZthlorid En Code requirements in accordance with Section R402.4.1.2. <br /> 14" 4e� <br /> Signature of Tester Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.