My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20445
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 7:35:31 AM
Creation date
6/4/2019 7:35:29 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
18-20445
Building Department - Name
DR HORTON INC
Address
6764 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017- AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> TABLE 402.4.1.1 <br /> AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> Project Name: Aria 1672 Efev C Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City,State,Zip: Zephyrhills, FL, Permit Number: x <br /> 0 <br /> Owner: Jurisdiction: _ <br /> Design Location: FL,Tampa c3 <br /> COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA <br /> General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shall <br /> The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. <br /> requirements Breaks or joints in the air barrier shall be sealed. <br /> The air barrier in.any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit <br /> Ceiling/attic the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. <br /> Access openings,drop down stairs or knee wall doors to <br /> unconditioned attic spaces shall be sealed. <br /> Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls <br /> The junction of the.top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity <br /> sealed. with a material having a thermal resistance of R-3 <br /> Knee walls shall be sealed. per inch minimum. <br /> Exterior thermal envelope insulation for framed <br /> walls shall be installed in substantial contact and <br /> continuous alignment with the air barrier. <br /> Windows,skylights The space between window/doorjambs and framing,and <br /> and doors skylights and framing shall be sealed. <br /> Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. <br /> Floors The air barrier shall be installed at any exposed_edge of Floor framing cavity insulation shall be installed to <br /> (including insulation. maintain permanent contact with the underside of <br /> above-garage subfloor decking,or floor framing cavity insulation <br /> and cantilevered shall be permitted to be in contact with the top side <br /> floors) of sheathing,or continuous insulation installed on <br /> the underside of floor framing and extends from the <br /> bottom to the top of all perimeter floor framing <br /> members. <br /> Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation <br /> a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace <br /> Shafts,penetrations Duct shafts,utility penetrations,and flue shafts opening to <br /> exterior or unconditioned space shall be sealed. <br /> Batts in narrow cavities shall be cut to fit,or narrow <br /> Narrow cavities cavities shall be filled by insulation that on <br /> installation readily conforms to the available cavity <br /> spaces. <br /> Garage separation Air sealing shall be provided between the garage and conditioned spac as. <br /> Recessed fighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building <br /> shall be sealed to the drywall, thermal envelope shall be air tight and IC rated. <br /> Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring <br /> and plumbing in exterior walls,or insulation that on <br /> installation readily conforms to available space shall <br /> Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall <br /> on exterior wall tubs shall separate them from the showers and tubs, be insulated. <br /> Electrical/phone box or The air barrier shall be installed behind electrical or communication <br /> exterior walls boxes or air-sealed boxes shall be installed. <br /> HVAC register boots HVAC register boots that penetrate building thermal envelope shall <br /> be sealed to the sub-floor or drywall. <br /> Concealed When required to be sealed,concealed fire sprinklers shall only be. <br /> sprinklers sealed in a manner that is recommended by the manufacturer. <br /> Caulking or other adhesive sealants shall not be used to fill voids <br /> hptwppn fire sl2d and wells or ppilin <br /> a.In addition,inspection of log walls shall be in accordance with the provisions of 16C-400.. . <br /> 8/3.1/2018 10:32 AM EnergyGaugeO USA FBC 6th Edition(2017)Compliant Software Page'1 of 1 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.