My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21056
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 10:25:01 AM
Creation date
1/7/2020 10:24:57 AM
Metadata
Fields
Template:
Building Department
Company Name
LCGR 7344 GALL LLC LEON CAPITAL
Building Department - Doc Type
Permit
Permit #
19-21056
Building Department - Name
LCGR 7344 GALL LLC LEON CAPITAL
Address
7344 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section <br /> # Mechanical Rough-In Inspection Complies? Comments/Assumptions <br /> &Req.ID <br /> eW43Thermally ineffective panel surfaces of;❑Complies ;Requirement will be met. <br /> sensible heating panels have ;❑Does Not <br /> insulation >= R-3.5. ;❑Not Observable <br /> ❑Not Applicable <br /> C403.2.9. HVAC ducts and plenums insulated ;❑Complies ;Requirement will be met. <br /> 1.1 3and sealed according to Florida ;❑Does Not <br /> [ME60]2 Section C403.2.9,Table C403.2.9.1. I❑Not Observable <br /> ❑Not Applicable 1 ` <br /> C403.2.9. 5All ducts, air handlers,filter boxes, ;❑Complies !Requirement will be met. <br /> 2 Ibuilding cavities, mechanical closets :❑Does Not <br /> [ME79]2 Sand enclosed support platforms that ; <br /> form the primary air containment ;❑Not Observable, <br /> j passageways for air distribution ;❑Not Applicable <br /> systems are constructed and erected <br /> in accordance with Table C403.2.9.2 i <br /> and with Chapter 6 of the Florida <br /> Building Code, Mechanical. Ducts are ; <br /> be constructed, braced, reinforced I <br /> and installed to provide structural <br /> strength and durability.All transverse <br /> .joints, longitudinal seams and fitting <br /> iconnections are securely fastened in ; <br /> accordance with the applicable <br /> standards of this section. I <br /> C403.2.9. Duct insulation is protected from ;❑Complies ;Requirement will be met. <br /> 1.2 jdamage but not limited to the ;❑Does Not <br /> [ME80]2 following: 1. Insulation exposed to ❑Not Observable <br /> weather is suitable for outdoor , <br /> service.Cellular foam insulation is {❑Not Applicable <br /> i protected or painted with a coating ; <br /> that is water retardant and provides <br /> shielding from solar radiation.2. <br /> Insulation covering cooling ducts <br /> located outside the conditioned space <br /> is vapor retardant located outside the <br /> insulation, all penetrations and joints <br /> Hof which shall be sealed. <br /> C4012.9. !Additional insulation with vapor ;❑Complies :Exception: Requirement does not apply. <br /> 1.3 y barrier is provided where the ;❑Does Not <br /> [ME81]z 'minimum duct insulation requirements! <br /> {❑Not Observable <br /> Hof Section C403.2.9.1.1 are <br /> j determined to be insufficient to i❑Not Applicable ; <br /> !prevent condensation. ; <br /> C403.2.13 Unenclosed spaces that are heated ;❑Complies ;Exception: Requirement does not apply. <br /> [ME71]2 use only radiant heat. ;❑Does Not <br /> ❑Not Observable; <br /> ❑Not Applicable <br /> C403.2.3 )HVAC equipment efficiency verified. ;❑Complies ;See the Mechanical Systems list for values. <br /> [ME55]2 ;❑Does Not <br /> ❑Not Observable <br /> ❑Not Applicable <br /> C403:2.9. Ducts, air handlers,filter boxes, ;❑Complies ;Requirement will be met. <br /> 3 building cavities, mechanical closets ;❑Does Not <br /> [ME10]2 and enclosed support platforms that ; ; <br /> !form the primary air containment ;❑Not Observable, <br /> Ithepassageways for air distribution :❑Not Applicablesystems are sealed in accordance with;applicable criteria of this section I <br /> and Table C403.2.9.2. <br /> 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) <br /> Project Title: Zephyrhills Dental Building Report date: 02/13/19 <br /> Data filename: D:\Hill Foley Rossi\Heartland Dental\Zephyrhills, FL\Heartland Zephyrhills Comcheck.cck Page 7 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.