Laserfiche WebLink
Submitted To: Quote q: <br /> Interstruct'lnc Q10PBDF58 <br /> Address: Date: <br /> 8186 Woodland Center Blvd 4-20-19 <br /> City: State: 21p code:p <br /> aa L oo La� Tampa FL Tam a <br /> (� _ <br /> /!bl Phone N: Fax q: <br /> 727.512.6426 <br /> 'Email Address: <br /> 1 <br /> State Certified CCCO42846 alex@interstructinc.com <br /> State Certified CGC1507166 lob name: lob Phone a: <br /> 1905 N 40th St • Tampa,Florida 33605 Job location: <br /> Phone:(813)620-4-797•Fax:(813)62.6-1756 7344 Gall.Boulevard Zephyrhills, FL 33541 <br /> We hereby submit specifications and estimates for: <br /> TPO Roof Recover as listed below: <br /> 1. Pull necessary permits. <br /> 2. Sweep loose gravel from roof and remove any other loose debris. <br /> I. Aqueous insulation to be removed and replace at$18 sq. Ft <br /> 4. Additional metal deck to be repaired at$15 sq. Ft&any additional i4"plywood at$2.00 sq.-FT <br /> S. Furnish and install new''/:" plywood on rear of parapet walls. <br /> -6. Furnish and install 1 layer separator between roofing systems. (preliminary attached) <br /> 7. Furnish and install Carlisle 60 mil Thermoplastic polyolefin (TPO)single-ply roofing system. <br /> 8. Furnish and install TPO single-ply roofing system on all parapet walls. <br /> 9. Furnish and install penetrations,transitions &termination flashings as necessary. <br /> 10. Furnish and install new coping cap on parapet walls,color to be chosen by owner. <br /> 11. Furnish our(3)three-year contractor's workmanship warranty. <br /> 12. Furnish manufacturer's 15 year material warranty. <br /> Notes:TPO membrane to be gray in color. <br /> The roofing industry Is currently experiencing price volatility in asphalt related products.Because firm,prices cannot be obtained from suppliers,prices at - Irject to <br /> change.If there is an increase in the price of asphalt related products,charge to the contractor subsequent to making this proposallcontract,d tl/contra shall <br /> be increased to reflect the additional cost to the contractor,upon submittal of written documentation thereof. <br /> Sum for the above: .Fifty three thousand four hundred dollars 00/100 Dollar 53,400.00 <br /> Payment to be made as follows: Schedule of values to be determined before start of job. <br /> All niatc-nals guaranteed to tan as spenhed or equal to.All work ro camplatpd in a ivnikmanlike manner Salesman: <br /> according to standani practices.Any alterauous or deviation from above specs icapons involving extra cost will <br /> be executed.only upon written orders and will become an extra chuge over and above the estimate. Atl Signature: <br /> damage and other necessary Insurance to hold contractor harmbss Irani tenants claims Our workers are fully Ehsan Siddigui 813-777-7647 <br /> agreements:ontingentuponstnkes.Kt.rdentsordelaysbeyondourcontrol.O:inertocarrybre,tornado.water Name: <br /> covered by Ylorkman's compensation Insurance Any monies not pad as agreed will incur V)4,per month <br /> interest rate Any cost incurred by Quabty Fooling.hu far Irrigation will be paid by non prevailing party. Email Address: Ehsan uali Roofin .eom <br /> Acceptance ofContraet: The above pnce.spacdtcations and condrtlans are sat:siactory and are <br /> he.hy accepted You atNaulhoozed to J.i v„,d.as spadbed Payment will be madoos Outlined above. Owner/Agen <br /> _ Signature: <br /> Date of S (� l Name: <br /> Acceptance: <br /> Note:This proposal may be.(ithtim,na by en if not accepted within 30 days from date at top Title: <br />