Laserfiche WebLink
Submitted To: Quote H: <br /> Interstruct Inc Q4POOF43 <br /> - � i4ddress: Date. <br /> 8186 Woodland Center Blvd 4-8-19. . <br /> City: State: Zip Code: <br /> �'a L � Ile, � i `�� Tampa FL 33614 <br /> IZL. i Phone ilk Fax : <br /> 727.512.6426 <br /> fEmail Address: <br /> State Certified CCC042846 ,° alex@interstructinc.com <br /> State Certified CGC1507166 Job Name: Job Phone H: <br /> 19.05 N 40th Street •Tampa, Florida 33605 Job Location: <br /> Phone:(813) 620-4797• Fax:(813)626-1756 7344 Gall Boulevard Zephyrhills, FL 33541 <br /> We hereby submit specifications and estimates for: <br /> Flat ROOF REPAIR as listed below: <br /> 1) Spud back gravel as necessary to form proper tie in for parapet wall. <br /> 2) Remove existing roofing materials in repair area and haul away all debris. <br /> 3) Furnish and install W plywood on the back of parapet wall. <br /> 4) Inspect woodwork and make necessary repairs at an additional cost as follows: <br /> $4.00 per sq.ft.on %" plywood decking. <br /> $4.50 per sq.ft.on fire-rated plywood when required. <br /> $4.50 per linear ft. on 1x6 plank decking: <br /> $5.00 per linear ft-on 2x4 structural lumber. <br /> $6.50 per.linear ft. on.1x6 wood fascia. <br /> $1.50 per linear ft. on 1x2 fascia drip. <br /> $15.00 sq.ft. on lightweight concrete. <br /> 5) Furnish and install new smooth surface modifiedbitumen interply sheet,fully adhered. <br /> 6) Furnish and install a granular surface modified bitumen cap sheet,fully adhered. <br /> 7) Properly tie in new underlayment with tar&gravel system. <br /> 8) Furnish and install new coping cap, color to be picked out by owner. <br /> The roofing Industry is currently experiencing price volatility in asphalt related products.Because firm prices cannot be obtained from suppliers,prices are subject to <br /> change.If there is an increase In the price of asphalt related products,charge to the contractor subsequent to making this proposakontracGthe ptu cintract%h 11 <br /> be increased to reflect the additional cost to the contractor,uoon submittal of written documentatlon thereof. <br /> Nine thousand six hundred dollars 00/100 Dollars S . 9,60o.00 <br /> Sum for the above: <br /> Payment to be made as follows: Due upon completion. <br /> All materials guaranleed W be as specified of equal to AV work to completed in a workmenfike manner Salesman- <br /> .wcotdmg to standard practices.Any alterations or deviation from about•sworicalions involving eitlra cost vnll <br /> he executed only upon written orders and w:ll become an extra charge over mid above the eatlrtlale. All Signature: 1 <br /> damage and oilier necessary insurance to hold contractor harmless from lenanis claims.Our workers are fully Ehsan Sidd 1 qui 813-777-7647 <br /> agreements contingent upon slakes,scadents or delays beyond our tomrof chvnor to carry tire,fornado,water Name: <br /> covered by Workma+is Compensation Insurance Any monles not paid as agreed veil]incur iltab per awnth <br /> Interest Wte Any toil loturrecf by Quality Roofing,hit,for litigation will be paid by norrprevmlhlg party. Email Address: Ehsan -Roofin .coin <br /> Acceptance of Contract* lit•above price,spenficabonsandconditions ate salistxiory and are, /� <br /> hereby accepted You are aulhonredlnd,, •0.asspecihed Payment wibhe made asoulfinadabove. Owner/Agent <br /> Signature. <br /> Date of ` Name: G <br /> Acceptance, <br /> Note:This proposal maybe w]ihdnwr n by it if not accepted within 30 days from date at top Title: <br />