Laserfiche WebLink
k • <br /> HOCK-IT SUSTem 4..0 nsTaLL <br /> f eu7, Nlk <br /> d <br /> Fig.A <br /> .Install EcoFasten"Solar Fleshing;with Rock-It Mounts <br /> •rdtawtsSeslatisec�it4u�acr�al'nr#�t+tngandbrae�ti�tafi(c�natrc�}. <br /> •Opttmumrerticalo> iagba#ststsi8'pkeseno�Eadimankn. <br /> .Setnraustsone3+reen�sc+nrrsott�sxlxpndc�tPe6estnt�osstlseSout�exfofieac>Ftt , <br /> •Sat motmtsonatlupperrcwssathatthel�och-ItPsdestaltsanti�NbrtReraloEilodcit511de. <br /> 2 Instal(Rock-lt.Array Skirt:onto Eave Mounts <br /> •Slide Rrick-It Array Skirt into from channel on Rack-It SWE <br /> •Array 5ldrt End.CapS ate pra-ittsUW on the East end ofeachsl(rt section.and amused to couple Uw'sllrtsections where needed(see ft A). <br /> •Tighten MId-Camp bolt damping Ratk4tArmyS11(irtto nourtt."IMPto 200urib&OMtn-fbawhmitutftwuh32mmrrodulest. <br /> _ install Rock-it LouplingS Mhen jolntng 4 panels with a toupting,the use of a toad bearing foot Is required) <br /> -Prior to mounting an the rool,snop Loadiieaong fcotlydo the bottom ofltodc-Reoupling If nqutre'd. <br /> (Each toad Searing Foot is set to sameheightasthe Rod-it Mounts-adjust mowminnggw <br /> On eave raw only xWeRod 4tAMSistrt onto'Rock-tt Coupling Shetf.Torquetospedliedvalm <br /> •NOM tra coupling lands an a rafter the hybrid Mouar should be used in ptarn ofthe Rack-It Coupling(rafcr to Image 33). <br /> -Hybrid Mount can be made in the Reid by assembling a coupling to amount pedestal,or by purchasing separately. <br /> 5 Align and Straightest First Row"of the Rock-it System with Rock-itArray Skirt <br /> •u:eaarth-soum PAck-ft Pedestal tostralghten,PAckatArrayD tend.asg modulewlthArraysdrL <br /> •TorqueserewonstdeatRorh-ttt�edestait+tMiitrit>+tosetsvetetothaRodctt9ide. <br /> Adjust Flenge Level Mato IeM the system(optional-on be WOW dunngar•(berinstslt6w4. <br /> _9 Install-1St Row of"FrV Modules <br /> •5ildeuttopettod�teLtoursdormtooaRaffintrrndule <br /> .tna�itRat�ros,pta�sann�atr�apesta��tst�tiaratpar�ts. <br /> •Torque 2nd;mwofMW434n%psanHoWtMaunrsandPm 4tCbtmI1ngst4specifiedvalue <br /> •tnaatibalano�afPV'rrndutaeuurtngttrattt�RodNltPed�talsarelnthnapprrgstatepasnlas�th�rtnrquaMr,QOampstoseor�emodults. <br /> .1 - Level the Rock-lt system <br /> •Whenarseemblylscongtetm,level theamresysumbyacQui ingRangetevJMom flatW lzel Nuts hm mtorquevaluel <br /> Netghibetweertwdsurfaw and t eofmoduiesshoulfberor(esstvttan9n"184PtdvAthlYpe2modules, <br /> INSTALLATION NOTE:Modules should be Installed so that the Junction box is Installed upslope,away.from the leading edge of the array. <br /> wwwecofastensdlarcom info@eoofastensolarcom 877-859-3947 5 <br />