My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21236
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 11:13:03 AM
Creation date
1/8/2020 10:39:34 AM
Metadata
Fields
Template:
Building Department
Company Name
ALPHA VILLAGE
Building Department - Doc Type
Permit
Permit #
19-21236
Building Department - Name
STANTON JR,FREDERICK E & SHEILA
Address
7322 LANDOVER DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 i . <br /> ROCK--IT'CLIP SS V ISTc`3LL s�t� <br /> 1-Locate all parts <br /> •Locate the'Rock-it Gip SS,micro-Inverter/power optimizer;and the section of the module framd In which <br /> you:wrill be mounting the micro-inverter/power optimizer. <br /> See fig.A for acceptable mounting locations. <br /> 2 Install the Rock-it Clip SS <br /> • Slide the.Rock-It Clip SS onto.the lip of the moduleframe. <br /> • Slide the micro-inverter/power optimbw Into the opposite lip of the RocWt Cllp-SS. <br /> • Tighten the boltto 150 In-1b minumum to clamp-the Rock It Cilp SS to themodule frame and the <br /> milcro-inverter/p�ower optimizerto,the Rock it CIIp SS. <br /> • Ensure that the lip on the eilp Is fight against the frame and that the micro-Inverter/power optimizer flange is. <br /> tight against the clip flange to avoid rotation during tightening. <br /> ROCK-IT CLIP 2.O inSTr3LL. <br /> Inverter Flange <br /> a <br /> Module Frame <br /> Rock•!t Clip 2.Q <br /> t Locate all parts <br /> .-Locate the Rock-it Clip 2.Q;micro-Inverter/power optimizer,and.the section of the module frame In which you. <br /> will be mounting the micro4riverter/power optimizer. <br /> :2 Install the Rock It Clip 2.0(See:below detalli <br /> • Slide the Rock-It Clip 2.0 onto the lip of the.mift4nverter/power optimizer. <br /> • Slide the micro-inverter/power optimizer Into the oppositeilp of the module frame. <br /> • Tighten the bait to 150 In-lb tD-clamp the Rock:it Clip 2.0 to ttihte module frame and the micro-inverter/power <br /> optimizer to-the Rock-lt Clip 2.0. <br /> Ensure that the lip on the clip Is tight against the frame and thatthe m1cro4nverter/power.optirnUer flange Is <br /> tightagalitst the clip flange to avoid-rotation during tightening. <br /> www.ecofbAensolar.com info@eco%stensolarcom 877-859-3947 7 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.