My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21437
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21437
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 2:22:20 PM
Creation date
1/8/2020 2:22:19 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR BREEZE
Building Department - Doc Type
Permit
Permit #
19-21437
Building Department - Name
KUHNS,SANDRA
Address
6119 19TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Roof will be comprised of trusses and a conventionally framed gable roof and will <br /> tie into the existing roof, covered with plywood and metal roof to match existing <br /> metal roof as closely as possible in color <br /> Electrical <br /> • To code only and provided. Includes 4 outlets, one light, one fan and one switch <br /> Plumbing <br /> • None included <br /> Misc. <br /> • All surveys are paid for by owner <br /> • No sod or landscape included in this bid - <br /> • No impact fees included in this bid , <br /> • e(�dQ,�dean �� la� � Z 3 <br /> rvl A-v �sit — ry o ee sue- -�-�3s c�cc P�xcl� ! <br /> Contract Change Orders F <br /> • Owners may at any reasonable time during the progress of the work,by an order <br /> in writing, agreed to and signed by both parties,make any alteration to the plans <br /> and specifications, and the work shall then be executed according to conformance <br /> with an executed Contract Change Order. Any change from the signed plans and <br /> specifications must be in writing and must be paid for at the time the change is <br /> agreed upon. If the change is a deletion the amount shall be credited against the <br /> final payment. There will be a$250.00 administration fee for each change order. _ <br /> Commencement Date and Protection <br /> • The contract amount has been determined as of the Contract date. Because of <br /> periods of inflation in the building industry, Builder will only guarantee that <br /> amount for 45 days from Contract date. If any problems arise which delays <br /> commencement through no fault of Builder, there may be an additional amount <br /> added to contract. This figure will be determined at the time that construction <br /> commences. At that time, if Builder requests a price increase in writing, Owner <br /> has the firm option of canceling the Contract by a letter in writing to Builder <br /> within ten(10) calendar days from the date increase is requested. <br /> Subcontractors <br /> Ryman Construction has built a solid reputation on quality construction and timely <br /> completion, and we have built a long-standing relationship with the most qualified <br /> subcontractors in our area, Ryman Construction, Inc./Ryman Construction of Florida, <br /> Inc., will not allow any outside subcontractors to work on our site. There are no <br /> exceptions! <br /> - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.