My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21437
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21437
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 2:22:20 PM
Creation date
1/8/2020 2:22:19 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR BREEZE
Building Department - Doc Type
Permit
Permit #
19-21437
Building Department - Name
KUHNS,SANDRA
Address
6119 19TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mold <br /> • Mold is a naturally occurring growth that may have adverse health consequences, <br /> and which requires certain preventative and proper maintenance actions by the <br /> buyer. Accordingly, contractor assumes no liability whatsoever from any harm to <br /> individuals and damages to property arising as a result of mold unrelated to <br /> construction defects. <br /> Increases in materials costs: <br /> • In the event that, during construction of the improvement described herein, <br /> contractor's costs for materials used or to be used herein are increased by more <br /> than ten percent(10%) over the contractor's costs for same at the time this <br /> agreement was signed, for any cause(s)beyond the control of contractor,then, <br /> and in such event(s), contractor shall have the right to pass the entire amount of - <br /> materials costs increase(s) along to Buyer by addition the total amount(s)thereof <br /> to the Contract Price. <br /> • ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW(SECTIONS 713.001- <br /> 713.379 FLORIDA STATUTES),THOSE WHO WORK ON YOUR PROPERTY OR <br /> PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT ! <br /> TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS <br /> CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A <br /> SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS,SUB-SUBCONTRACTORS,OR <br /> —Not included in Contract <br /> • Impact fees if any <br /> • Sod or landscaping. dl <br /> I hereby propose to furnish materials and labor in accordance with the above 1 <br /> s`2 <br /> specifications for the sum of,..twe thousand seven hundred and eighty nine <br /> dollars and fifty cents($27,789.00) <br /> Payment Schedule: 5% at signing of this agreement <br /> 40% at completion of front wood = 1 k I j 1 S j 0v <br /> 35% upon completion of addition. _ qtj ZG.o� <br /> We agree with the above specifications and payment schedule. By our signatures below, <br /> you are authorized to begin work. O <br /> die ee�pvt� �c elc <br /> a <br /> - ` y GZ <br /> San u s Date <br /> an, President Date <br /> Ryman Construction, Inc. <br /> - 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.