Laserfiche WebLink
Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department <br /> of Energy and Pacific Northwest National Laboratory. <br /> Adopted with permission <br /> Topic Section Component Description Yes N/A exempt <br /> 1.To be checked by Designer or Engineer rvu,m <br /> Insulation 5.8.1.2 Envelope Below-grade wall insulation installed per <br /> manufacturers€TMs instructions. <br /> Insulation 5.8.1.2 Envelope Slab edge insulation installed per manufacturers El El ❑ <br /> €TMs instructions. <br /> Insulation 5.5.3.5 Envelope Slab edge insulation depthAength. <br /> Insulation 6.4.4.1.5 Envelope Bottom surface of floor structures incorporating <br /> radiant heating insulated to>=R-3.5. <br /> Fenestration 5.5.3.6 Envelope U-factor of opaque doors associated with the <br /> building thermal envelope meets requirements. <br /> SYSTEM—SPECIFIC 6.5.1,6.5.1.1, Mechanical Air economizers provided where required(and not <br /> 6.5.1.3,6.5.1.4 exempted),meet the requirements for design <br /> capacity,control signal,ventilation controls, <br /> high-limit shut-off,integrated economizer control, <br /> and provide a means to relieve excess outside air <br /> during operation. <br /> SYSTEM—SPECIFIC 6.5.1,6.5.1.2, Mechanical Water economizers provided where required, El 0 El <br /> 6.5.1.3 meet the requirements for design capacity, <br /> maximum pressure drop and integrated . <br /> economizer control. <br /> SYSTEM—SPECIFIC 6.5.1.5 Mechanical Economizer operation will not increase heating ❑ ❑ El <br /> energy use during normal operation. <br /> SYSTEM—SPECIFIC 6.5.2.2.1 Mechanical Three-pipe hydronic systems using a common <br /> return for hot and chilled water are not used. <br /> SYSTEM—SPECIFIC 6.5.2.2.3 Mechanical Hydronic heat pump systems connected to a <br /> common water loop meet heat rejection and heat <br /> addition requirements. <br /> SYSTEM—SPECIFIC 6.5.1.6 Mechanical Water economizer specified on hydronic cooling <br /> and humidification systems designed to maintain <br /> inside humidity at>35 A°F dewpoint if an <br /> economizer is required. <br /> SYSTEM—SPECIFIC 6.5.3.1.1 Mechanical HVAC fan systems at design conditions do not El E <br /> exceed allowable fan system motor nameplate hp <br /> or fan system bhp. <br /> SYSTEM—SPECIFIC 6.5.3.1.2 Mechanical HVAC fan motors not larger than the first available El 0 <br /> motor size greater than the bhp. <br /> HVAC 6.5.6.1 Mechanical Exhaust air energy recovery on systems meeting El 0 El <br /> Tables 6.5.6.1-1,and 6.5.6.1-2. <br /> SYSTEM—SPECIFIC 7.4.2 Mechanical Service water heating equipment meets efficiency <br /> requirements. <br /> SYSTEM—SPECIFIC 7.5.2 Mechanical Service water heating equipment used for space <br /> heating complies with the service water heating <br /> equipment requirements. <br /> Insulation 5.8.1-2 Envelope Above-grade wall insulation installed per <br /> manufacturers€TMs instructions. <br /> Insulation 5.8.1.2 Envelope Floor insulation installed per manufacturera€TMs <br /> instructions. <br /> Controls 10.4.3 Mechanical Elevators are designed with the proper lighting, El Q ED <br /> ventilation power,and standby n lbde. <br /> SYSTEM—SPECIFIC 6.4.1.1,6.8.1-7a Mechanical Heat Rejection Equipment:Minimum Efficiency <br /> Requirement Table 6.8.1-7 <br /> SYSTEM—SPECIFIC 6.4.1.1,6.8.1-7b Mechanical Heat Rejection Equipment:Minimum Efficiency <br /> Requirement Table 6.8.1-7 <br /> SYSTEM—SPECIFIC 6.4.1.1,6.8.1-7c Mechanical Heat Rejection Equipment:Minimum Efficiency L1- 0 <br /> RequirementTable 6.8.1-7 <br /> EnergyGauge Summit®Fla/Com-2017.TAM 2017-1.0 Compliant Software.Effective Date: Dec 31,2017 <br /> Florida Building Code,Sixth Edition(2017)-Energy Conservation ASHRAE 90.1-2013-Prescriptive Compliance Option <br /> 7/6/2018 Page 8 of 21 <br />